2008China Harbour EngineeringRequires access

Numerical Modeling Study of Tidal Flow and Sediment for Reclamation Project for Wenzhou Petrochemical Industrial Base

Wendan Li

Open publisher page 0 citations

Abstract

A mathematical model was set up with the TK-2D software for the tidal flow and sedimentation in the sea area in the Oujiang Estuary.With the mathematical model,simulations and studies were made to analyze the influence of the reclamation project for Wenzhou Petrochemical Industrial Base upon the North Oujiang Estuary,Middle Waterway,Huangda'ao Waterway,Zhongshan Waterway,Shatou Waterway,Xiaomen Waterway and Huangdaxia Waterway;the flood discharge and drainage of stagnant water in the Oujiang Estuary;and the vicinal ports and sea area.The results of the studies show that the reclamation project will impose little impact upon the vicinal ports and waterways and the construction of the reclamation project for Wenzhou Petrochemical Industrial Base is feasible.

About this research paper

What this paper is about

A mathematical model was set up with the TK-2D software for the tidal flow and sedimentation in the sea area in the Oujiang Estuary.With the mathematical model,simulations and studies were made to analyze the influence of the reclamation project for Wenzhou Petrochemical Industrial Base upon the North Oujiang Estuary,Middle Waterway,Huangda'ao Waterway,Zhongshan Waterway,Shatou Waterway,Xiaomen Waterway and Huangdaxia Waterway;the flood discharge and drainage of stagnant water in the Oujiang Estuary;and the vicinal ports and sea area.The results of the studies show that the reclamation project will impose little impact upon the vicinal ports and waterways and the construction of the reclamation project for Wenzhou Petrochemical Industrial Base is feasible.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A mathematical model was set up with the TK-2D software for the tidal flow and sedimentation in the sea area in the Oujiang Estuary.With the mathematical model,simulations and studies were made to analyze the influence of the reclamation project for Wenzhou Petrochemical Industrial Base upon the North Oujiang Estuary,Middle Waterway,Huangda'ao Waterway,Zhongshan Waterway,Shatou Waterway,Xiaomen Waterway and Huangdaxia Waterway;the flood discharge and drainage of stagnant water in the Oujiang Estuary;and the vicinal ports and sea area.The results of the studies show that the reclamation project will impose little impact upon the vicinal ports and waterways and the construction of the reclamation project for Wenzhou Petrochemical Industrial Base is feasible.

Key concepts: Land reclamation, Estuary, Environmental science, Sediment, Sedimentation, Hydrology (agriculture), Base flow, Environmental engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Numerical Modeling Study of Tidal Flow and Sediment for Reclamation Project for Wenzhou Petrochemical Industrial Base — Research Paper | ScholarLens