Discussion of Recent Optimal Operation of Xiaolangdi Reservoir

Shujun Liu

Open publisher page 1 citations

Abstract

2.522 billion m3 of sediment had deposited in the Xiaolangdi Reservoir by the end of 2011 after 12 years' operation,the flowing and sediment transport conditions in the main channel in the downstream of the Yellow River had been changed dramatically,so the operation mode of Xiaolangdi Reservoir regulation was badly in need of adjustment in the following aspects: 1)raise the flood control level appropriately;2)set flood control level and limited water lever for sediment reduction separately;3)adjust the operation mode of water and sediment regulation before the flood season;4)adjust the discharge control indicator under the water supply operation mode;5)cancel the sediment concentration limit in the discharge of Xiaolangdi Reservoir.

About this research paper

What this paper is about

2.522 billion m3 of sediment had deposited in the Xiaolangdi Reservoir by the end of 2011 after 12 years' operation,the flowing and sediment transport conditions in the main channel in the downstream of the Yellow River had been changed dramatically,so the operation mode of Xiaolangdi Reservoir regulation was badly in need of adjustment in the following aspects: 1)raise the flood control level appropriately;2)set flood control level and limited water lever for sediment reduction separately;3)adjust the operation mode of water and sediment regulation before the flood season;4)adjust the discharge control indicator under the water supply operation mode;5)cancel the sediment concentration limit in the discharge of Xiaolangdi Reservoir.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

2.522 billion m3 of sediment had deposited in the Xiaolangdi Reservoir by the end of 2011 after 12 years' operation,the flowing and sediment transport conditions in the main channel in the downstream of the Yellow River had been changed dramatically,so the operation mode of Xiaolangdi Reservoir regulation was badly in need of adjustment in the following aspects: 1)raise the flood control level appropriately;2)set flood control level and limited water lever for sediment reduction separately;3)adjust the operation mode of water and sediment regulation before the flood season;4)adjust the discharge control indicator under the water supply operation mode;5)cancel the sediment concentration limit in the discharge of Xiaolangdi Reservoir.

Key concepts: Sediment, Environmental science, Flood control, Flood myth, Channel (broadcasting), Hydrology (agriculture), Sediment transport, Mode (computer interface)