2011Central China Electric PowerRequires access

Investigation on the Operation Analysis And Setting Calculation of 110kV Main Transformer Backup Protection

Song Qi

Open publisher page 0 citations

Abstract

In the substation with two parallel operating three-winding transformers,if the short-circuit fault between the 10kV(or 35kV) protection CT of the main transformer to the same side bus occurs,the switch on 10kV(or 35kV) trips and fault still keeps,or the switch refuses to trip and the fault can not be isolated,which will cause the whole substation to loss power.This paper puts forward to add the compound voltage lockout directional overcurrent protection in backup protection of main transformer 10kV(or 35kV) side and the direction pointing from the same side bus to the main transformer,and introduces the setting calculation principles for the overcurrent protection,which ensures that losing power scope is the smallest.

About this research paper

What this paper is about

In the substation with two parallel operating three-winding transformers,if the short-circuit fault between the 10kV(or 35kV) protection CT of the main transformer to the same side bus occurs,the switch on 10kV(or 35kV) trips and fault still keeps,or the switch refuses to trip and the fault can not be isolated,which will cause the whole substation to loss power.This paper puts forward to add the compound voltage lockout directional overcurrent protection in backup protection of main transformer 10kV(or 35kV) side and the direction pointing from the same side bus to the main transformer,and introduces the setting calculation principles for the overcurrent protection,which ensures that losing power scope is the smallest.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In the substation with two parallel operating three-winding transformers,if the short-circuit fault between the 10kV(or 35kV) protection CT of the main transformer to the same side bus occurs,the switch on 10kV(or 35kV) trips and fault still keeps,or the switch refuses to trip and the fault can not be isolated,which will cause the whole substation to loss power.This paper puts forward to add the compound voltage lockout directional overcurrent protection in backup protection of main transformer 10kV(or 35kV) side and the direction pointing from the same side bus to the main transformer,and introduces the setting calculation principles for the overcurrent protection,which ensures that losing power scope is the smallest.

Key concepts: Backup, Overcurrent, Transformer, Engineering, Electrical engineering, Reliability engineering, Voltage, Automotive engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Investigation on the Operation Analysis And Setting Calculation of 110kV Main Transformer Backup Protection — Research Paper | ScholarLens