Technology and Application of Offshore Lifting for Large-Diameter and Ultra-Long Anchor Pile

YE Yong-bia

Open publisher page 0 citations

Abstract

Offshore anchor pile is very common in offshore structures such as jacket platform,offshore wind turbine platform and single point mooring system,etc.The installation of anchor pile has significant effect on the cost and process for the whole engineering,in which the lifting is the most important procedure in the offshore operation because it has a great demand for the crane capacity of the vessel.When the anchor pile is too long for the crane to lift vertically,underwater horizontal upending is required in the operation.We elaborate the scheme of underwater horizontal upending for the large-diameter and ultra-long anchor pile offshore lifting and discuss the key technical difficult points.An engineering example of anchor pile installation of single point mooring system in South China Sea is given,through which the reliability of underwater horizontal upending scheme is introduced and validated.This program provides new ideas and approaches for large-diameter and ultra-long anchor pile offshore installation.

About this research paper

What this paper is about

Offshore anchor pile is very common in offshore structures such as jacket platform,offshore wind turbine platform and single point mooring system,etc.The installation of anchor pile has significant effect on the cost and process for the whole engineering,in which the lifting is the most important procedure in the offshore operation because it has a great demand for the crane capacity of the vessel.When the anchor pile is too long for the crane to lift vertically,underwater horizontal upending is required in the operation.We elaborate the scheme of underwater horizontal upending for the large-diameter and ultra-long anchor pile offshore lifting and discuss the key technical difficult points.An engineering example of anchor pile installation of single point mooring system in South China Sea is given,through which the reliability of underwater horizontal upending scheme is introduced and validated.This program provides new ideas and approaches for large-diameter and ultra-long anchor pile offshore installation.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Offshore anchor pile is very common in offshore structures such as jacket platform,offshore wind turbine platform and single point mooring system,etc.The installation of anchor pile has significant effect on the cost and process for the whole engineering,in which the lifting is the most important procedure in the offshore operation because it has a great demand for the crane capacity of the vessel.When the anchor pile is too long for the crane to lift vertically,underwater horizontal upending is required in the operation.We elaborate the scheme of underwater horizontal upending for the large-diameter and ultra-long anchor pile offshore lifting and discuss the key technical difficult points.An engineering example of anchor pile installation of single point mooring system in South China Sea is given,through which the reliability of underwater horizontal upending scheme is introduced and validated.This program provides new ideas and approaches for large-diameter and ultra-long anchor pile offshore installation.

Key concepts: Submarine pipeline, Pile, Marine engineering, Offshore wind power, Mooring, Engineering, Underwater, Offshore construction

Related papers

Back to paper searchBrowse research topicsOriginal source
Technology and Application of Offshore Lifting for Large-Diameter and Ultra-Long Anchor Pile — Research Paper | ScholarLens