Long Pile Upending Lifting Study for Fixed Platform on Offshore Oil and Gas Field
Yandong Zhou, Facheng Wang
Abstract
Yandong Zhou, Facheng Wang
Abstract
Fixed platform have been widely employed in the offshore oil and gas reservoirs development. Pile foundation reliability is critical for these platforms where drilling, production and other functions are integrated. The lifting operation for the long pile, being a key step in the jacket installation, has been considered for further developments. With deep water developments, the sizes and weights of long piles are reasonably bigger. The corresponding process and equipment employed are subsequently altered, which brings challenges to developing a cost-effective, easy-operable approach for lifting operation. In this paper, the technology for the offshore long pile upending lifting operation including pile feature, installation methodology, lifting rigging and analysis model, covering water depths ranging from shallow to near deep water zone (60–300 m water depth) has been suggested. In addition, the applicability of the adoptable novel approaches has been discussed considering the practical project experience.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Fixed platform have been widely employed in the offshore oil and gas reservoirs development. Pile foundation reliability is critical for these platforms where drilling, production and other functions are integrated. The lifting operation for the long pile, being a key step in the jacket installation, has been considered for further developments. With deep water developments, the sizes and weights of long piles are reasonably bigger. The corresponding process and equipment employed are subsequently altered, which brings challenges to developing a cost-effective, easy-operable approach for lifting operation. In this paper, the technology for the offshore long pile upending lifting operation including pile feature, installation methodology, lifting rigging and analysis model, covering water depths ranging from shallow to near deep water zone (60–300 m water depth) has been suggested. In addition, the applicability of the adoptable novel approaches has been discussed considering the practical project experience.
Key concepts: Submarine pipeline, Pile, Reliability (semiconductor), Oil field, Deep water, Process (computing), Computer science, Foundation (evidence)