Design of composite pile foundation and settlement calculation
Jingbo Su
Abstract
Jingbo Su
Abstract
The design method of composite pile foundation is introduced. Progress of total settlement of composite pile foundation is analyzed; and the method of settlement calculation is presented. The ground settlement due to the load shared by pile group is calculated with layerwise summation method based on Geddes' stress method; and the ground settlement duo to the load shared by soils under pile cap is calculated with layerwise summation method based on Boussinesq's deformation formula; the summation of two settlement above equals the total settlement of composite pile foundation. The design and settlement calculation methods have been applied to certain building with composite pile foundation; the results show that the pile number is decreased about 1/3, and saved cost 35 %, while the total settlement increased a little.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The design method of composite pile foundation is introduced. Progress of total settlement of composite pile foundation is analyzed; and the method of settlement calculation is presented. The ground settlement due to the load shared by pile group is calculated with layerwise summation method based on Geddes' stress method; and the ground settlement duo to the load shared by soils under pile cap is calculated with layerwise summation method based on Boussinesq's deformation formula; the summation of two settlement above equals the total settlement of composite pile foundation. The design and settlement calculation methods have been applied to certain building with composite pile foundation; the results show that the pile number is decreased about 1/3, and saved cost 35 %, while the total settlement increased a little.
Key concepts: Pile, Settlement (finance), Foundation (evidence), Composite number, Geotechnical engineering, Engineering, Structural engineering, Mathematics