Lifting of Steel Pipe Arch Truss Segment of Main Bridge of Wuhan Jianghan No.3 Bridge

Yang Qi

Open publisher page 0 citations

Abstract

The main bridge of Wuhan Jianghan No 3 Bridge is an under\|supporting steel pipe concrete truss non\|hinge tied arch bridge. The lifting of its steel pipe arch truss segment adopted spatial high tower frame structure combined cable tower and anchor tower and mainly controlling the shifting of hanging system combined checking cable force method. With practical projects, authors introduce the construction method and principle, schedule, plan and technical points of the lifting construction of steel pipe arch truss segments.

About this research paper

What this paper is about

The main bridge of Wuhan Jianghan No 3 Bridge is an under\|supporting steel pipe concrete truss non\|hinge tied arch bridge. The lifting of its steel pipe arch truss segment adopted spatial high tower frame structure combined cable tower and anchor tower and mainly controlling the shifting of hanging system combined checking cable force method. With practical projects, authors introduce the construction method and principle, schedule, plan and technical points of the lifting construction of steel pipe arch truss segments.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main bridge of Wuhan Jianghan No 3 Bridge is an under\|supporting steel pipe concrete truss non\|hinge tied arch bridge. The lifting of its steel pipe arch truss segment adopted spatial high tower frame structure combined cable tower and anchor tower and mainly controlling the shifting of hanging system combined checking cable force method. With practical projects, authors introduce the construction method and principle, schedule, plan and technical points of the lifting construction of steel pipe arch truss segments.

Key concepts: Truss, Structural engineering, Arch, Engineering, Tower, Bridge (graph theory), Span (engineering), Arch bridge