90. Cautious Excavation and Foundation Treatment for Turbine Units of Underground River Bed Power House, Sardar Sarovar (Narmada) Project

D.T. Patel, Naiya Suthar, Dinsha Patel

Open publisher page 0 citations

Abstract

The underground power house at Sardar Sarovar (Narmada) Project is in advanced construction stage. The power house is situated on right bank of river and 157.5 in the downstream of toe of Main Dam. It will house six reversible units for generating 1200 MW power. The excavation for the cavern of underground power house was suspended in1993 due to distressing in both upstream and downstream walls. After completion of treatment for strengthening the walls, the remaining excavation for the cavern and turbine units was resumed in April 1999. The turbine pits are surrounded by other underground openings leaving thin rock ledges between each other. In view of this and already distressed rock mass in the side walls, the excavation for the turbine pit had to be done with utmost care. At present, the excavation of pits for all six turbines have been completed and the installation of units 1 to 4 is in progress. The paper gives the details of rock mass characteristics, design parameters, support system, precautionary measures taken for the cut faces of turbine pits and treatment provided to the foundation of turbine pits.

About this research paper

What this paper is about

The underground power house at Sardar Sarovar (Narmada) Project is in advanced construction stage. The power house is situated on right bank of river and 157.5 in the downstream of toe of Main Dam. It will house six reversible units for generating 1200 MW power. The excavation for the cavern of underground power house was suspended in1993 due to distressing in both upstream and downstream walls. After completion of treatment for strengthening the walls, the remaining excavation for the cavern and turbine units was resumed in April 1999. The turbine pits are surrounded by other underground openings leaving thin rock ledges between each other. In view of this and already distressed rock mass in the side walls, the excavation for the turbine pit had to be done with utmost care. At present, the excavation of pits for all six turbines have been completed and the installation of units 1 to 4 is in progress. The paper gives the details of rock mass characteristics, design parameters, support system, precautionary measures taken for the cut faces of turbine pits and treatment provided to the foundation of turbine pits.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The underground power house at Sardar Sarovar (Narmada) Project is in advanced construction stage. The power house is situated on right bank of river and 157.5 in the downstream of toe of Main Dam. It will house six reversible units for generating 1200 MW power. The excavation for the cavern of underground power house was suspended in1993 due to distressing in both upstream and downstream walls. After completion of treatment for strengthening the walls, the remaining excavation for the cavern and turbine units was resumed in April 1999. The turbine pits are surrounded by other underground openings leaving thin rock ledges between each other. In view of this and already distressed rock mass in the side walls, the excavation for the turbine pit had to be done with utmost care. At present, the excavation of pits for all six turbines have been completed and the installation of units 1 to 4 is in progress. The paper gives the details of rock mass characteristics, design parameters, support system, precautionary measures taken for the cut faces of turbine pits and treatment provided to the foundation of turbine pits.

Key concepts: Excavation, Foundation (evidence), Turbine, Geotechnical engineering, Engineering, Power station, Mining engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
90. Cautious Excavation and Foundation Treatment for Turbine Units of Underground River Bed Power House, Sardar Sarovar (Narmada) Project — Research Paper | ScholarLens