Investigations and Design of the Hew Pltmooth Sewerage Scheme Ocean Outfall

Gordon B Henderson, RW Fullerton

Open publisher page 0 citations

Abstract

The paper describes investigations undertaken for the design of an ocean outfall for disposal of treated effluent from the City of New Plymouth's wastewater treatment plant. The outfall is 575 metres long. 950mm diameter and constructed of mild steel pipe. Wind and tidal currents were investigated using current drogues and dye releases. Bathymetric sidescan sonar and subsurface profile surveys were used to select the optimal outfall route. Structural design required research of suitable pipeline materials, corrosion protection systems and an appraisal of potential launching techniques.

About this research paper

What this paper is about

The paper describes investigations undertaken for the design of an ocean outfall for disposal of treated effluent from the City of New Plymouth's wastewater treatment plant. The outfall is 575 metres long. 950mm diameter and constructed of mild steel pipe. Wind and tidal currents were investigated using current drogues and dye releases. Bathymetric sidescan sonar and subsurface profile surveys were used to select the optimal outfall route. Structural design required research of suitable pipeline materials, corrosion protection systems and an appraisal of potential launching techniques.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper describes investigations undertaken for the design of an ocean outfall for disposal of treated effluent from the City of New Plymouth's wastewater treatment plant. The outfall is 575 metres long. 950mm diameter and constructed of mild steel pipe. Wind and tidal currents were investigated using current drogues and dye releases. Bathymetric sidescan sonar and subsurface profile surveys were used to select the optimal outfall route. Structural design required research of suitable pipeline materials, corrosion protection systems and an appraisal of potential launching techniques.

Key concepts: Outfall, Sewerage, Bathymetry, Wastewater, Current (fluid), Environmental science, Marine engineering, Effluent

Related papers

Back to paper searchBrowse research topicsOriginal source
Investigations and Design of the Hew Pltmooth Sewerage Scheme Ocean Outfall — Research Paper | ScholarLens