Waitara Outfall Refurbishment Project Pigging Investigations

John Murray

Open publisher page 0 citations

Abstract

The Waitara outfall was installed in 1978 and was damaged during construction. It discharges treated wastes from the township of Waitara and several industries in the area. It leaks at several locations along its length. Free spans have occurred removing external support from the pipe. The performance of the diffuser does not meet statutory discharge requirements. A study commissioned in November 1988 identified that the outfall could be refurbished by inserting an HDPE liner pipe throughout the length of the pipeline. This with stability measures could effectively extend the design life of the outfall by 25 years at less than the capital cost of a new outfall. A pigging programme was devised to check the internal condition of the outfall and the feasibility of installing the liner pipe. This paper describes the preparations for and implementation of the pigging programme in 1989.

About this research paper

What this paper is about

The Waitara outfall was installed in 1978 and was damaged during construction. It discharges treated wastes from the township of Waitara and several industries in the area. It leaks at several locations along its length. Free spans have occurred removing external support from the pipe. The performance of the diffuser does not meet statutory discharge requirements. A study commissioned in November 1988 identified that the outfall could be refurbished by inserting an HDPE liner pipe throughout the length of the pipeline. This with stability measures could effectively extend the design life of the outfall by 25 years at less than the capital cost of a new outfall. A pigging programme was devised to check the internal condition of the outfall and the feasibility of installing the liner pipe. This paper describes the preparations for and implementation of the pigging programme in 1989.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Waitara outfall was installed in 1978 and was damaged during construction. It discharges treated wastes from the township of Waitara and several industries in the area. It leaks at several locations along its length. Free spans have occurred removing external support from the pipe. The performance of the diffuser does not meet statutory discharge requirements. A study commissioned in November 1988 identified that the outfall could be refurbished by inserting an HDPE liner pipe throughout the length of the pipeline. This with stability measures could effectively extend the design life of the outfall by 25 years at less than the capital cost of a new outfall. A pigging programme was devised to check the internal condition of the outfall and the feasibility of installing the liner pipe. This paper describes the preparations for and implementation of the pigging programme in 1989.

Key concepts: Outfall, Pigging, Engineering, Pipeline transport, Environmental science, Marine engineering, Environmental engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Waitara Outfall Refurbishment Project Pigging Investigations — Research Paper | ScholarLens