2010DOAJ (DOAJ: Directory of Open Access Journals)Open access

Evaluation of felling productivity in Shafarood forest (Guilan province)

Ramin Naghdi, Mehrdad Nikooy, S Mohammadi Limaie, Y Shormage

Open full text 1 citations

Abstract

Felling as the initiation of harvesting chain-work is the first step for preparing trees to market consumption which has severe effect on the subsequent work stages. The aim of this research is to assess the productivity of manual felling and costs of felling team as well as recognizing their effective factors. In this evaluation after identifying work elements of one felling turn, 72 felling turns were time studied. Furthermore independent variables such as tree diameter at cutting stump height, distance between trees, longitudinal and latitudinal slopes were time studied in each turn. Felling time regression model is a function of independent variables such as tree diameter and distance between trees. Amount of production including delay time and without delay time were 63.48 and 83.19 m3 per hour, respectively. The cost determination model which recommended by Forests, Rangelands and Watershed Organization project work agenda was used to determine felling costs. Therefore, felling costs with delay time and without delay time were 4017 Rials per m3 (26872 Rials per tree) and 3065 Rials per m3 (20516 Rial per tree), respectively. The under cut and back cut time and technical delays formed the greatest felling element time of chain saw felling. Examination of the variation effect of the variables on time due to the variation of felling cost showed that increasing in each of the variables causes an increase in time and therefore increases felling costs.

About this research paper

What this paper is about

Felling as the initiation of harvesting chain-work is the first step for preparing trees to market consumption which has severe effect on the subsequent work stages. The aim of this research is to assess the productivity of manual felling and costs of felling team as well as recognizing their effective factors. In this evaluation after identifying work elements of one felling turn, 72 felling turns were time studied. Furthermore independent variables such as tree diameter at cutting stump height, distance between trees, longitudinal and latitudinal slopes were time studied in each turn. Felling time regression model is a function of independent variables such as tree diameter and distance between trees. Amount of production including delay time and without delay time were 63.48 and 83.19 m3 per hour, respectively. The cost determination model which recommended by Forests, Rangelands and Watershed Organization project work agenda was used to determine felling costs. Therefore, felling costs with delay time and without delay time were 4017 Rials per m3 (26872 Rials per tree) and 3065 Rials per m3 (20516 Rial per tree), respectively. The under cut and back cut time and technical delays formed the greatest felling element time of chain saw felling. Examination of the variation effect of the variables on time due to the variation of felling cost showed that increasing in each of the variables causes an increase in time and therefore increases felling costs.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Felling as the initiation of harvesting chain-work is the first step for preparing trees to market consumption which has severe effect on the subsequent work stages. The aim of this research is to assess the productivity of manual felling and costs of felling team as well as recognizing their effective factors. In this evaluation after identifying work elements of one felling turn, 72 felling turns were time studied. Furthermore independent variables such as tree diameter at cutting stump height, distance between trees, longitudinal and latitudinal slopes were time studied in each turn. Felling time regression model is a function of independent variables such as tree diameter and distance between trees. Amount of production including delay time and without delay time were 63.48 and 83.19 m3 per hour, respectively. The cost determination model which recommended by Forests, Rangelands and Watershed Organization project work agenda was used to determine felling costs. Therefore, felling costs with delay time and without delay time were 4017 Rials per m3 (26872 Rials per tree) and 3065 Rials per m3 (20516 Rial per tree), respectively. The under cut and back cut time and technical delays formed the greatest felling element time of chain saw felling. Examination of the variation effect of the variables on time due to the variation of felling cost showed that increasing in each of the variables causes an increase in time and therefore increases felling costs.

Key concepts: Felling, Productivity, Forestry, Agroforestry, Geography, Environmental science, Economics, Macroeconomics

Related papers

Back to paper searchBrowse research topicsOriginal source
Evaluation of felling productivity in Shafarood forest (Guilan province) — Research Paper | ScholarLens