Repowering nets ESB Ireland 42% efficiency
R. Farmer
Abstract
R. Farmer
Abstract
Modification of an electric power plant located in Ireland is discussed. Improved plant efficiency of over 50% was realized by installing a gas turbine and unfired heat recovery boiler to repower an existing 30 MW steam turbine. Output increased by 85 MW and total cost was under $270 per kW. A combined cycle diagram is included.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Modification of an electric power plant located in Ireland is discussed. Improved plant efficiency of over 50% was realized by installing a gas turbine and unfired heat recovery boiler to repower an existing 30 MW steam turbine. Output increased by 85 MW and total cost was under $270 per kW. A combined cycle diagram is included.
Key concepts: Combined cycle, Power station, Installation, Environmental science, Boiler (water heating), Turbine, Gas turbines, Waste management