Repowering nets ESB Ireland 42% efficiency

R. Farmer

Open publisher page 0 citations

Abstract

Modification of an electric power plant located in Ireland is discussed. Improved plant efficiency of over 50% was realized by installing a gas turbine and unfired heat recovery boiler to repower an existing 30 MW steam turbine. Output increased by 85 MW and total cost was under $270 per kW. A combined cycle diagram is included.

About this research paper

What this paper is about

Modification of an electric power plant located in Ireland is discussed. Improved plant efficiency of over 50% was realized by installing a gas turbine and unfired heat recovery boiler to repower an existing 30 MW steam turbine. Output increased by 85 MW and total cost was under $270 per kW. A combined cycle diagram is included.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Modification of an electric power plant located in Ireland is discussed. Improved plant efficiency of over 50% was realized by installing a gas turbine and unfired heat recovery boiler to repower an existing 30 MW steam turbine. Output increased by 85 MW and total cost was under $270 per kW. A combined cycle diagram is included.

Key concepts: Combined cycle, Power station, Installation, Environmental science, Boiler (water heating), Turbine, Gas turbines, Waste management

Related papers

Back to paper searchBrowse research topicsOriginal source
Repowering nets ESB Ireland 42% efficiency — Research Paper | ScholarLens