Colorado's Sheep Mountain CO/sub 2/ Project moves forward

J.J. Kenfro

Open publisher page 0 citations

Abstract

Completion of the definition study to move 300 mmscfd of carbon dioxide (CO/sup 2/) from Colorado to west Texas marks another milestone on the enhanced recovery (ER) trail. Improving oil prices and the need to recover every barrel possible are positive catalysts for building a 20-in. pipeline some 420 miles to the Permian Basin. Declining production in the basin is another. As a result of studies begun by Arco Oil and Gas in 1972, leasing of land and the formation of 2 development units put the project into position for drilling and producing CO/sub 2/. The conceptual design for such production facilities showed similarity to natural gas production except that it costs more. Enhanced recovery CO/sub 2/ projects could potentially recover up to 40% of all ER oil.

About this research paper

What this paper is about

Completion of the definition study to move 300 mmscfd of carbon dioxide (CO/sup 2/) from Colorado to west Texas marks another milestone on the enhanced recovery (ER) trail. Improving oil prices and the need to recover every barrel possible are positive catalysts for building a 20-in. pipeline some 420 miles to the Permian Basin. Declining production in the basin is another. As a result of studies begun by Arco Oil and Gas in 1972, leasing of land and the formation of 2 development units put the project into position for drilling and producing CO/sub 2/. The conceptual design for such production facilities showed similarity to natural gas production except that it costs more. Enhanced recovery CO/sub 2/ projects could potentially recover up to 40% of all ER oil.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Completion of the definition study to move 300 mmscfd of carbon dioxide (CO/sup 2/) from Colorado to west Texas marks another milestone on the enhanced recovery (ER) trail. Improving oil prices and the need to recover every barrel possible are positive catalysts for building a 20-in. pipeline some 420 miles to the Permian Basin. Declining production in the basin is another. As a result of studies begun by Arco Oil and Gas in 1972, leasing of land and the formation of 2 development units put the project into position for drilling and producing CO/sub 2/. The conceptual design for such production facilities showed similarity to natural gas production except that it costs more. Enhanced recovery CO/sub 2/ projects could potentially recover up to 40% of all ER oil.

Key concepts: Milestone, Natural gas, Drilling, Production (economics), Petroleum engineering, Permian, Petroleum, Barrel (horology)