Construction aspects of the Garden Route bridges

Betsy Bruce, G.J. Brodrick

Open publisher page 0 citations

Abstract

The simultaneous construction of 3 large concrete arch bridges, of which the one over the Bloukrans Gorge ranks as the 4th largest of its kind in the world, required the development of some sophisticated construction techniques and equipment; the mobilization and commissioning of no less than 5 cable cranes; and the appointment of sufficient and competent construction personnel, capable of achieving the relatively tight programme safely, profitably and to a high standard of quality and workmanship. The completion of all three bridges ahead of their tendered schedules and the subsequent accolades bestowed upon the Bloukrans Bridge in particular are evidence not only of the success of the construction process, but also of the unique relationships which developed between contractor and consultants and which had such marked effects on the end result.

About this research paper

What this paper is about

The simultaneous construction of 3 large concrete arch bridges, of which the one over the Bloukrans Gorge ranks as the 4th largest of its kind in the world, required the development of some sophisticated construction techniques and equipment; the mobilization and commissioning of no less than 5 cable cranes; and the appointment of sufficient and competent construction personnel, capable of achieving the relatively tight programme safely, profitably and to a high standard of quality and workmanship. The completion of all three bridges ahead of their tendered schedules and the subsequent accolades bestowed upon the Bloukrans Bridge in particular are evidence not only of the success of the construction process, but also of the unique relationships which developed between contractor and consultants and which had such marked effects on the end result.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The simultaneous construction of 3 large concrete arch bridges, of which the one over the Bloukrans Gorge ranks as the 4th largest of its kind in the world, required the development of some sophisticated construction techniques and equipment; the mobilization and commissioning of no less than 5 cable cranes; and the appointment of sufficient and competent construction personnel, capable of achieving the relatively tight programme safely, profitably and to a high standard of quality and workmanship. The completion of all three bridges ahead of their tendered schedules and the subsequent accolades bestowed upon the Bloukrans Bridge in particular are evidence not only of the success of the construction process, but also of the unique relationships which developed between contractor and consultants and which had such marked effects on the end result.

Key concepts: Workmanship, Engineering, Bridge (graph theory), Forensic engineering, Project commissioning, Arch bridge, Quality (philosophy), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction aspects of the Garden Route bridges — Research Paper | ScholarLens