Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction

Taekwun Park, Moon Kyum Kim, Changyoon Kim, Hyoungkwan Kim

Open publisher page 20 citations

Abstract

The high expectation of esthetic and functional quality in modern civil infrastructure has resulted in the increased demand for long span bridges. In advanced or developing countries, long span bridges such as cable-stayed and suspension bridges are considered even as landmarks that symbolize the prosperity or culture of the region. These long span bridges require higher level of design and construction technologies than other types of bridges. In particular, the construction of cable-stayed bridges involves precise and sophisticated operation of construction equipment such as derrick cranes. However, it is not easy to plan the operations of a derrick crane before the actual construction process takes place. Unexpected spatial constraints in the construction site may hinder the smooth operation of a derrick crane, which leads to lower than expected productivity and safety. This study applies interactive three-dimensional (3D) computer aided design (CAD) to the derrick crane operation for the purpose of identifying potential problems. Construction managers can have the two way process with the 3D CAD system to interactively test their construction plans and scenarios. The case study shows that the interactive 3D CAD system significantly improves the constructability of the cable-stayed bridge construction.

About this research paper

What this paper is about

The high expectation of esthetic and functional quality in modern civil infrastructure has resulted in the increased demand for long span bridges. In advanced or developing countries, long span bridges such as cable-stayed and suspension bridges are considered even as landmarks that symbolize the prosperity or culture of the region. These long span bridges require higher level of design and construction technologies than other types of bridges. In particular, the construction of cable-stayed bridges involves precise and sophisticated operation of construction equipment such as derrick cranes. However, it is not easy to plan the operations of a derrick crane before the actual construction process takes place. Unexpected spatial constraints in the construction site may hinder the smooth operation of a derrick crane, which leads to lower than expected productivity and safety. This study applies interactive three-dimensional (3D) computer aided design (CAD) to the derrick crane operation for the purpose of identifying potential problems. Construction managers can have the two way process with the 3D CAD system to interactively test their construction plans and scenarios. The case study shows that the interactive 3D CAD system significantly improves the constructability of the cable-stayed bridge construction.

Why it matters

OpenAlex reports 20 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The high expectation of esthetic and functional quality in modern civil infrastructure has resulted in the increased demand for long span bridges. In advanced or developing countries, long span bridges such as cable-stayed and suspension bridges are considered even as landmarks that symbolize the prosperity or culture of the region. These long span bridges require higher level of design and construction technologies than other types of bridges. In particular, the construction of cable-stayed bridges involves precise and sophisticated operation of construction equipment such as derrick cranes. However, it is not easy to plan the operations of a derrick crane before the actual construction process takes place. Unexpected spatial constraints in the construction site may hinder the smooth operation of a derrick crane, which leads to lower than expected productivity and safety. This study applies interactive three-dimensional (3D) computer aided design (CAD) to the derrick crane operation for the purpose of identifying potential problems. Construction managers can have the two way process with the 3D CAD system to interactively test their construction plans and scenarios. The case study shows that the interactive 3D CAD system significantly improves the constructability of the cable-stayed bridge construction.

Key concepts: Constructability, Bridge (graph theory), Engineering, Process (computing), CAD, Plan (archaeology), Span (engineering), Construction engineering