1994Compendium of Technical Papers, 64th ITE Annual MeetingInstitute of Transportation Engineers (ITE)Requires access

INTEGRATION OF LIGHT RAIL OPERATIONS AND ROADWAY TRAFFIC CONTROL -- THE DALLAS AREA RAPID TRANSIT SYSTEM APPROACH

D N Carter, Emily Ramirez

Open publisher page 0 citations

Abstract

Dallas Area Rapid Transit (DART) is constructing a 20-mile double track light rail transit (LRT) starter system. Much of this system will operate at-grade, crossing 66 roadways. These crossings will occur in median-running, side-running, and mid-block, and transitway mall environments. Each condition requires special traffic control, coordination, and safety features. Because there are so many at-grade crossings in the DART LRT starter system, the provision of a safe and efficient LRT/traffic interface is necessary for the success of the system. This paper discusses the approach used to control and coordinate light rail and motor vehicle traffic in each operating environment.

About this research paper

What this paper is about

Dallas Area Rapid Transit (DART) is constructing a 20-mile double track light rail transit (LRT) starter system. Much of this system will operate at-grade, crossing 66 roadways. These crossings will occur in median-running, side-running, and mid-block, and transitway mall environments. Each condition requires special traffic control, coordination, and safety features. Because there are so many at-grade crossings in the DART LRT starter system, the provision of a safe and efficient LRT/traffic interface is necessary for the success of the system. This paper discusses the approach used to control and coordinate light rail and motor vehicle traffic in each operating environment.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Dallas Area Rapid Transit (DART) is constructing a 20-mile double track light rail transit (LRT) starter system. Much of this system will operate at-grade, crossing 66 roadways. These crossings will occur in median-running, side-running, and mid-block, and transitway mall environments. Each condition requires special traffic control, coordination, and safety features. Because there are so many at-grade crossings in the DART LRT starter system, the provision of a safe and efficient LRT/traffic interface is necessary for the success of the system. This paper discusses the approach used to control and coordinate light rail and motor vehicle traffic in each operating environment.

Key concepts: Track (disk drive), Transport engineering, Light rail, Transit (satellite), Engineering, Light rail transit, Control (management), Control system

Related papers

Back to paper searchBrowse research topicsOriginal source
INTEGRATION OF LIGHT RAIL OPERATIONS AND ROADWAY TRAFFIC CONTROL -- THE DALLAS AREA RAPID TRANSIT SYSTEM APPROACH — Research Paper | ScholarLens