2010Transportation research circularRequires access

Bus Rapid Transit as a Precursor of Light Rail Transit

Lyndon Henry, David Dobbs

Open publisher page 0 citations

Abstract

Can high-quality bus services—often described as bus rapid transit (BRT)–effectively function as a precursor of a subsequent electric light rail transit (LRT) system? This issue is frequently raised in at least two planning situations: (a) the alignment is envisioned ultimately for LRT, but a low-capital-cost BRT-type service is undertaken until ridership demand in the given corridor grows to justify a heavier rail investment; and (b) installation of a new LRT system or line is under way, and a BRT-type service is implemented to help build interim ridership in anticipation of the new electric rail service. This paper looks at design features that can facilitate a transition from BRT to LRT, as well as challenges and drawbacks. Several specific examples where the issue of converting or transitioning from BRT-type operations to LRT has been raised are then examined.

About this research paper

What this paper is about

Can high-quality bus services—often described as bus rapid transit (BRT)–effectively function as a precursor of a subsequent electric light rail transit (LRT) system? This issue is frequently raised in at least two planning situations: (a) the alignment is envisioned ultimately for LRT, but a low-capital-cost BRT-type service is undertaken until ridership demand in the given corridor grows to justify a heavier rail investment; and (b) installation of a new LRT system or line is under way, and a BRT-type service is implemented to help build interim ridership in anticipation of the new electric rail service. This paper looks at design features that can facilitate a transition from BRT to LRT, as well as challenges and drawbacks. Several specific examples where the issue of converting or transitioning from BRT-type operations to LRT has been raised are then examined.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Can high-quality bus services—often described as bus rapid transit (BRT)–effectively function as a precursor of a subsequent electric light rail transit (LRT) system? This issue is frequently raised in at least two planning situations: (a) the alignment is envisioned ultimately for LRT, but a low-capital-cost BRT-type service is undertaken until ridership demand in the given corridor grows to justify a heavier rail investment; and (b) installation of a new LRT system or line is under way, and a BRT-type service is implemented to help build interim ridership in anticipation of the new electric rail service. This paper looks at design features that can facilitate a transition from BRT to LRT, as well as challenges and drawbacks. Several specific examples where the issue of converting or transitioning from BRT-type operations to LRT has been raised are then examined.

Key concepts: Bus rapid transit, Transport engineering, Light rail transit, Transit (satellite), Light rail, Service (business), Rail transit, Capital investment

Related papers

Back to paper searchBrowse research topicsOriginal source
Bus Rapid Transit as a Precursor of Light Rail Transit — Research Paper | ScholarLens