Designing Bus Rapid Transit for Light Rail Transit Convertibility: Introduction for Planners and Decision Makers
Eva Wood, David S. Shelton, Matt Shelden
Abstract
Eva Wood, David S. Shelton, Matt Shelden
Abstract
This paper focuses on considerations that should be included in the design of a busway–bus rapid transit (BRT) facility for future conversion from BRT to light rail transit (LRT). A selection of BRT and LRT projects in North America and overseas were reviewed to assess the current industry practice in relation to BRT conversion to LRT. Most BRT projects reviewed for this study contain some provisions for future conversion to LRT. However, other than the current project to convert the downtown Seattle, Washington, transit tunnel, no known conversions from BRT to LRT have occurred. Design elements that should be considered when the cross section for a project is determined include vehicle type (LRT, bus, guided bus) and the operational configuration (barrier separation, mixing of buses with general-purpose and high-occupancy vehicle traffic, etc.). Finally, the construction activities required for conversion depend on whether the BRT system was designed and constructed to include provisions for LRT. Such activities can involve modification to both the main line and stations. If no provisions for LRT were part of the busway design and construction, the cost of conversion can be significantly higher due to the need for more extreme modification or total reconstruction of structures and other facilities.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper focuses on considerations that should be included in the design of a busway–bus rapid transit (BRT) facility for future conversion from BRT to light rail transit (LRT). A selection of BRT and LRT projects in North America and overseas were reviewed to assess the current industry practice in relation to BRT conversion to LRT. Most BRT projects reviewed for this study contain some provisions for future conversion to LRT. However, other than the current project to convert the downtown Seattle, Washington, transit tunnel, no known conversions from BRT to LRT have occurred. Design elements that should be considered when the cross section for a project is determined include vehicle type (LRT, bus, guided bus) and the operational configuration (barrier separation, mixing of buses with general-purpose and high-occupancy vehicle traffic, etc.). Finally, the construction activities required for conversion depend on whether the BRT system was designed and constructed to include provisions for LRT. Such activities can involve modification to both the main line and stations. If no provisions for LRT were part of the busway design and construction, the cost of conversion can be significantly higher due to the need for more extreme modification or total reconstruction of structures and other facilities.
Key concepts: Bus rapid transit, Light rail transit, Transport engineering, Transit (satellite), Occupancy, Downtown, Light rail, Rail transit