Single-Trip Subsea Completions

Kenneth J. Johnson, R.A. Lorenzatto, Joao H. Rittershaussen, J. L. Barreto, Everaldo Lima Filho

Open publisher page 3 citations

Abstract

Abstract Reliability of completion equipment and rig time are becoming more and more critical for subsea completions because of continually increasing water depths in which operators are being required to complete wells. In addition, completion designs must reflect the more stringent economic requirements of today's oil and gas industry. This paper will describe the use of a single-trip completion system that has been successfully and economically installed in the offshore Marimba and Bonito fields of South America. This new completion system has the capability to land the tubing hanger and install it in the wellhead before setting the packer and compensating for subsequent tubing movement.1 The new system also can employ pre-job calculations — based on initial well conditions and anticipated conditions during production — that help determine appropriate completion configurations and bottomhole equipment compatibility. Many failures in offshore wells, whether platform or subsea, can be attributed to inappropriate application of downhole completion tools or methods.2 Use of pre-job calculations during the equipment design stage can facilitate proper selection of design criteria and can help ensure operational safety and cost efficiency. The development of this new completion system will be discussed in detail. Three case histories that document successful test completions will be reviewed along with the economic gains and advantages that the reduction in rig time generated.

About this research paper

What this paper is about

Abstract Reliability of completion equipment and rig time are becoming more and more critical for subsea completions because of continually increasing water depths in which operators are being required to complete wells. In addition, completion designs must reflect the more stringent economic requirements of today's oil and gas industry. This paper will describe the use of a single-trip completion system that has been successfully and economically installed in the offshore Marimba and Bonito fields of South America. This new completion system has the capability to land the tubing hanger and install it in the wellhead before setting the packer and compensating for subsequent tubing movement.1 The new system also can employ pre-job calculations — based on initial well conditions and anticipated conditions during production — that help determine appropriate completion configurations and bottomhole equipment compatibility. Many failures in offshore wells, whether platform or subsea, can be attributed to inappropriate application of downhole completion tools or methods.2 Use of pre-job calculations during the equipment design stage can facilitate proper selection of design criteria and can help ensure operational safety and cost efficiency. The development of this new completion system will be discussed in detail. Three case histories that document successful test completions will be reviewed along with the economic gains and advantages that the reduction in rig time generated.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract Reliability of completion equipment and rig time are becoming more and more critical for subsea completions because of continually increasing water depths in which operators are being required to complete wells. In addition, completion designs must reflect the more stringent economic requirements of today's oil and gas industry. This paper will describe the use of a single-trip completion system that has been successfully and economically installed in the offshore Marimba and Bonito fields of South America. This new completion system has the capability to land the tubing hanger and install it in the wellhead before setting the packer and compensating for subsequent tubing movement.1 The new system also can employ pre-job calculations — based on initial well conditions and anticipated conditions during production — that help determine appropriate completion configurations and bottomhole equipment compatibility. Many failures in offshore wells, whether platform or subsea, can be attributed to inappropriate application of downhole completion tools or methods.2 Use of pre-job calculations during the equipment design stage can facilitate proper selection of design criteria and can help ensure operational safety and cost efficiency. The development of this new completion system will be discussed in detail. Three case histories that document successful test completions will be reviewed along with the economic gains and advantages that the reduction in rig time generated.

Key concepts: Subsea, Wellhead, Completion (oil and gas wells), Submarine pipeline, Engineering, Computer science, Petroleum engineering, Marine engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Single-Trip Subsea Completions — Research Paper | ScholarLens