1992•Oil & gas journal/Oil and gas journalRequires access

Coiled tubing velocity string set at record 20,500 ft

Leslie Adams

Open publisher page 0 citations

Abstract

This paper reports that coiled tubing, set at record depth, significantly reduced costs and posed lower mechanical failure risk for recompleting a gas well in the Delaware basin of West Texas. Alternative completions such as replacing the existing tubing string with smaller diameter conventional API production tubing was deemed less economical and effective. The gas well, George M. Shelton No. 2, was recompleted on July 18, 1991, by Chevron U.S.A. Production Co. The gas is produced from the deep, low-pressure Ellenburger formation in the Gomez field. The hang-off depth of 20,500 ft set a world record for the deepest permanently installed coiled tubing. The 1-1/2 in. coiled tubing velocity string, run within the existing 4-1/2 and 4-in. tapered production tubing string, consists of seven segments that vary in wall thickness from 0.087 to 0.156 in.

About this research paper

What this paper is about

This paper reports that coiled tubing, set at record depth, significantly reduced costs and posed lower mechanical failure risk for recompleting a gas well in the Delaware basin of West Texas. Alternative completions such as replacing the existing tubing string with smaller diameter conventional API production tubing was deemed less economical and effective. The gas well, George M. Shelton No. 2, was recompleted on July 18, 1991, by Chevron U.S.A. Production Co. The gas is produced from the deep, low-pressure Ellenburger formation in the Gomez field. The hang-off depth of 20,500 ft set a world record for the deepest permanently installed coiled tubing. The 1-1/2 in. coiled tubing velocity string, run within the existing 4-1/2 and 4-in. tapered production tubing string, consists of seven segments that vary in wall thickness from 0.087 to 0.156 in.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper reports that coiled tubing, set at record depth, significantly reduced costs and posed lower mechanical failure risk for recompleting a gas well in the Delaware basin of West Texas. Alternative completions such as replacing the existing tubing string with smaller diameter conventional API production tubing was deemed less economical and effective. The gas well, George M. Shelton No. 2, was recompleted on July 18, 1991, by Chevron U.S.A. Production Co. The gas is produced from the deep, low-pressure Ellenburger formation in the Gomez field. The hang-off depth of 20,500 ft set a world record for the deepest permanently installed coiled tubing. The 1-1/2 in. coiled tubing velocity string, run within the existing 4-1/2 and 4-in. tapered production tubing string, consists of seven segments that vary in wall thickness from 0.087 to 0.156 in.

Key concepts: Coiled tubing, String (physics), Natural gas field, Geology, Petroleum engineering, Completion (oil and gas wells), Mining engineering, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Coiled tubing velocity string set at record 20,500 ft — Research Paper | ScholarLens