1995Civil engineeringRequires access

Base Isolation Gets Its Day in Court

Navin R. Amin, Anoop Mokha

Open publisher page 3 citations

Abstract

After the 1989 Loma Prieta earthquake, the 1905 U.S. Court of Appeals and Post Office Building in San Francisco was closed. The owner, General Services Administration Pacific Rim Region, decided to undertake a full-scale seismic upgrade of the building structure, along with its repair, renovation and expansion. Now under way and scheduled for completion by September 1995, the project will be the federal government's first and the world's largest seismic, or base, isolation retrofit project. Total estimated cost is $83 million, of which $24.4 million is for the seismic retrofit. Use of the friction pendulum base isolation system--a new approach developed in the U.S.--helped save $7.6 million and halved the time and labor required for bearing installation.

About this research paper

What this paper is about

After the 1989 Loma Prieta earthquake, the 1905 U.S. Court of Appeals and Post Office Building in San Francisco was closed. The owner, General Services Administration Pacific Rim Region, decided to undertake a full-scale seismic upgrade of the building structure, along with its repair, renovation and expansion. Now under way and scheduled for completion by September 1995, the project will be the federal government's first and the world's largest seismic, or base, isolation retrofit project. Total estimated cost is $83 million, of which $24.4 million is for the seismic retrofit. Use of the friction pendulum base isolation system--a new approach developed in the U.S.--helped save $7.6 million and halved the time and labor required for bearing installation.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

After the 1989 Loma Prieta earthquake, the 1905 U.S. Court of Appeals and Post Office Building in San Francisco was closed. The owner, General Services Administration Pacific Rim Region, decided to undertake a full-scale seismic upgrade of the building structure, along with its repair, renovation and expansion. Now under way and scheduled for completion by September 1995, the project will be the federal government's first and the world's largest seismic, or base, isolation retrofit project. Total estimated cost is $83 million, of which $24.4 million is for the seismic retrofit. Use of the friction pendulum base isolation system--a new approach developed in the U.S.--helped save $7.6 million and halved the time and labor required for bearing installation.

Key concepts: Base isolation, Engineering, Upgrade, Administration (probate law), Civil engineering, Isolation (microbiology), Government (linguistics), Seismic isolation

Related papers

Back to paper searchBrowse research topicsOriginal source
Base Isolation Gets Its Day in Court — Research Paper | ScholarLens