Seattle Plays It Safe
Walter F. Anton, Ronald M. Polivka, Laurel Harrington
Abstract
Walter F. Anton, Ronald M. Polivka, Laurel Harrington
Abstract
To ensure the reliability of its aging water system in a major earthquake, the Seattle Water Department commissioned a comprehensive assessment of the system's seismic reliability to serve as a guide in upgrading its facilities and pipelines. This assessment was one of the largest of its kind ever done. A report in 1990 identified facilities in the system that would be inoperable after a maximum credible earthquake, made preliminary recommendations and set priorities for their seismic upgrade. Design work on the upgrades is one-third complete, and the department will award the first contracts for construction later this year. Total costs for the program are $17 million, of which $12 million is for construction. Implementation is taking place over a seven-year period through 1996 in order to spread out the financial impact and ensure an orderly progression. The article describes the seismic assessments and planned upgrades.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
To ensure the reliability of its aging water system in a major earthquake, the Seattle Water Department commissioned a comprehensive assessment of the system's seismic reliability to serve as a guide in upgrading its facilities and pipelines. This assessment was one of the largest of its kind ever done. A report in 1990 identified facilities in the system that would be inoperable after a maximum credible earthquake, made preliminary recommendations and set priorities for their seismic upgrade. Design work on the upgrades is one-third complete, and the department will award the first contracts for construction later this year. Total costs for the program are $17 million, of which $12 million is for construction. Implementation is taking place over a seven-year period through 1996 in order to spread out the financial impact and ensure an orderly progression. The article describes the seismic assessments and planned upgrades.
Key concepts: Upgrade, Pipeline transport, Work (physics), Engineering, Reliability (semiconductor), Civil engineering, Forensic engineering, Computer science