An Algebraic Approach for Determining the Optimal Lot Size for EPQ Model with Rework Process
Singa Wang Chiu, Chi-Bin Cheng, Meifang Wu, Jyh-Chau Yang
Abstract
Open-access reader
Singa Wang Chiu, Chi-Bin Cheng, Meifang Wu, Jyh-Chau Yang
Abstract
Open-access reader
This paper presents a simple algebraic approach for deriving the optimal lot size for economic production quantity (EPQ) model with rework process. Conventional methods for solving lot size problems are by using differential calculus on the long-run average production-inventory cost function with the need to prove optimality first. A few recent articles proposed the algebraic approach to the solution of classic economic order quantity (EOQ) and EPQ model without reference to the use of derivatives. This paper extends it to an EPQ model with reworking of defective items. We demonstrate that optimal lot size and optimal production-inventory cost for such an imperfect EPQ model can be derived without derivatives. As a result, it may enable the practitioners or students who with little knowledge of calculus to understand or handle with ease the realistic production systems.
OpenAlex reports 17 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper presents a simple algebraic approach for deriving the optimal lot size for economic production quantity (EPQ) model with rework process. Conventional methods for solving lot size problems are by using differential calculus on the long-run average production-inventory cost function with the need to prove optimality first. A few recent articles proposed the algebraic approach to the solution of classic economic order quantity (EOQ) and EPQ model without reference to the use of derivatives. This paper extends it to an EPQ model with reworking of defective items. We demonstrate that optimal lot size and optimal production-inventory cost for such an imperfect EPQ model can be derived without derivatives. As a result, it may enable the practitioners or students who with little knowledge of calculus to understand or handle with ease the realistic production systems.
Key concepts: Economic production quantity, Rework, Economic order quantity, Differential calculus, Production (economics), Imperfect, Algebraic number, Computer science