2006•Proceedings of the Institution of Mechanical Engineers Part B Journal of Engineering ManufactureRequires access

Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives

Yuan-Shyi Peter Chiu, Hong-Dar Lin, Feng‐Tsung Cheng

Open publisher page 29 citations

Abstract

This paper is concerned with the algebraic derivation for the production lot size problem with backlogging, random defective rate, and rework. Conventional approaches for solving optimal production lot size are by using the differential calculus on the productioninventory cost function with the need to prove optimality first. Recent articles proposed the algebraic approach to the solution of the classic economic order quantity (EOQ) and economic production quantity (EPQ) models without reference to the use of derivatives. This paper extends it to an EPQ model taking backlogging, random defective rate, and rework into consideration. This note demonstrates that optimal lot size for such an imperfect quality EPQ model can be derived without derivatives. The expected production-inventory costs can also be obtained immediately.

About this research paper

What this paper is about

This paper is concerned with the algebraic derivation for the production lot size problem with backlogging, random defective rate, and rework. Conventional approaches for solving optimal production lot size are by using the differential calculus on the productioninventory cost function with the need to prove optimality first. Recent articles proposed the algebraic approach to the solution of the classic economic order quantity (EOQ) and economic production quantity (EPQ) models without reference to the use of derivatives. This paper extends it to an EPQ model taking backlogging, random defective rate, and rework into consideration. This note demonstrates that optimal lot size for such an imperfect quality EPQ model can be derived without derivatives. The expected production-inventory costs can also be obtained immediately.

Why it matters

OpenAlex reports 29 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper is concerned with the algebraic derivation for the production lot size problem with backlogging, random defective rate, and rework. Conventional approaches for solving optimal production lot size are by using the differential calculus on the productioninventory cost function with the need to prove optimality first. Recent articles proposed the algebraic approach to the solution of the classic economic order quantity (EOQ) and economic production quantity (EPQ) models without reference to the use of derivatives. This paper extends it to an EPQ model taking backlogging, random defective rate, and rework into consideration. This note demonstrates that optimal lot size for such an imperfect quality EPQ model can be derived without derivatives. The expected production-inventory costs can also be obtained immediately.

Key concepts: Rework, Economic production quantity, Economic order quantity, Production (economics), Mathematical optimization, Imperfect, Sizing, Algebraic number

Related papers

Back to paper searchBrowse research topicsOriginal source
Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives — Research Paper | ScholarLens