2006IEEE Transactions on Semiconductor ManufacturingRequires access

A Problem Reduction Approach for Scheduling Semiconductor Wafer Fabrication Facilities

Abhijit Upasani, Reha Uzsoy, Karthik Sourirajan

Open publisher page 46 citations

Abstract

Most scheduling procedures used in industry are based on the dispatching paradigm, where decisions are made based on the jobs available at the time the machine becomes free. While optimization-based scheduling procedures have repeatedly been shown to yield significantly better schedules under ideal circumstances, their practical implementation is hampered by high computational requirements. We present a problem reduction procedure that allows a workcenter-based global scheduling heuristic to be implemented in very low CPU times. The procedure partitions the workcenters in a fab into heavily loaded and lightly loaded classes and solves the global scheduling problem only for the heavily loaded workcenters. The proposed technique is tested on instances drawn from an International SEMATECH wafer fab model. The proposed problem reduction approach yields superior results with modest computational effort, enabling the practical use of the decomposition heuristic.

About this research paper

What this paper is about

Most scheduling procedures used in industry are based on the dispatching paradigm, where decisions are made based on the jobs available at the time the machine becomes free. While optimization-based scheduling procedures have repeatedly been shown to yield significantly better schedules under ideal circumstances, their practical implementation is hampered by high computational requirements. We present a problem reduction procedure that allows a workcenter-based global scheduling heuristic to be implemented in very low CPU times. The procedure partitions the workcenters in a fab into heavily loaded and lightly loaded classes and solves the global scheduling problem only for the heavily loaded workcenters. The proposed technique is tested on instances drawn from an International SEMATECH wafer fab model. The proposed problem reduction approach yields superior results with modest computational effort, enabling the practical use of the decomposition heuristic.

Why it matters

OpenAlex reports 46 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Most scheduling procedures used in industry are based on the dispatching paradigm, where decisions are made based on the jobs available at the time the machine becomes free. While optimization-based scheduling procedures have repeatedly been shown to yield significantly better schedules under ideal circumstances, their practical implementation is hampered by high computational requirements. We present a problem reduction procedure that allows a workcenter-based global scheduling heuristic to be implemented in very low CPU times. The procedure partitions the workcenters in a fab into heavily loaded and lightly loaded classes and solves the global scheduling problem only for the heavily loaded workcenters. The proposed technique is tested on instances drawn from an International SEMATECH wafer fab model. The proposed problem reduction approach yields superior results with modest computational effort, enabling the practical use of the decomposition heuristic.

Key concepts: Wafer fabrication, Scheduling (production processes), Job shop scheduling, Computer science, Semiconductor device fabrication, Reduction (mathematics), Mathematical optimization, Wafer

Related papers

Back to paper searchBrowse research topicsOriginal source
A Problem Reduction Approach for Scheduling Semiconductor Wafer Fabrication Facilities — Research Paper | ScholarLens