A Problem Reduction Approach for Scheduling Semiconductor Wafer Fabrication Facilities
Abhijit Upasani, Reha Uzsoy, Karthik Sourirajan
Abstract
Abhijit Upasani, Reha Uzsoy, Karthik Sourirajan
Abstract
Most scheduling procedures used in industry are based on the dispatching paradigm, where decisions are made based on the jobs available at the time the machine becomes free. While optimization-based scheduling procedures have repeatedly been shown to yield significantly better schedules under ideal circumstances, their practical implementation is hampered by high computational requirements. We present a problem reduction procedure that allows a workcenter-based global scheduling heuristic to be implemented in very low CPU times. The procedure partitions the workcenters in a fab into heavily loaded and lightly loaded classes and solves the global scheduling problem only for the heavily loaded workcenters. The proposed technique is tested on instances drawn from an International SEMATECH wafer fab model. The proposed problem reduction approach yields superior results with modest computational effort, enabling the practical use of the decomposition heuristic.
OpenAlex reports 46 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Most scheduling procedures used in industry are based on the dispatching paradigm, where decisions are made based on the jobs available at the time the machine becomes free. While optimization-based scheduling procedures have repeatedly been shown to yield significantly better schedules under ideal circumstances, their practical implementation is hampered by high computational requirements. We present a problem reduction procedure that allows a workcenter-based global scheduling heuristic to be implemented in very low CPU times. The procedure partitions the workcenters in a fab into heavily loaded and lightly loaded classes and solves the global scheduling problem only for the heavily loaded workcenters. The proposed technique is tested on instances drawn from an International SEMATECH wafer fab model. The proposed problem reduction approach yields superior results with modest computational effort, enabling the practical use of the decomposition heuristic.
Key concepts: Wafer fabrication, Scheduling (production processes), Job shop scheduling, Computer science, Semiconductor device fabrication, Reduction (mathematics), Mathematical optimization, Wafer