2000Transportation Research Record Journal of the Transportation Research BoardRequires access

Top-Down Cracking in Washington State Asphalt Concrete Wearing Courses

Jeff S. Uhlmeyer, Kim Willoughby, Linda M. Pierce, Joe P. Mahoney

Open publisher page 105 citations

Abstract

For years, pavement engineers within the Washington State Department of Transportation (WSDOT) have observed that longitudinal and fatigue (multiple-interconnected) cracks in their thicker asphalt concrete (AC) pavements appeared to crack from the top of the wearing course downward. Often, the cracks stop at the interface between the wearing course and the underlying bituminous layers (a depth of about 50 mm). Studies done elsewhere in the United States and internationally have reported similar results. The results of extensive coring that WSDOT routinely collects in its pavement rehabilitation process were compared in a study. WSDOT normally cores AC pavements to determine thickness for use in mechanistic-empirical design. In addition to coring for AC thickness, specific information noting surface-initiated (top-down) cracking with the crack depth or full-depth cracking was noted. WSDOT observed top-down cracking occurring in the thicker sections, with thinner sections cracking full depth. Top-down cracking generally started within 3 to 8 years of paving for pavement sections that were structurally adequate and were designed for adequate equivalent single-axle loads.

About this research paper

What this paper is about

For years, pavement engineers within the Washington State Department of Transportation (WSDOT) have observed that longitudinal and fatigue (multiple-interconnected) cracks in their thicker asphalt concrete (AC) pavements appeared to crack from the top of the wearing course downward. Often, the cracks stop at the interface between the wearing course and the underlying bituminous layers (a depth of about 50 mm). Studies done elsewhere in the United States and internationally have reported similar results. The results of extensive coring that WSDOT routinely collects in its pavement rehabilitation process were compared in a study. WSDOT normally cores AC pavements to determine thickness for use in mechanistic-empirical design. In addition to coring for AC thickness, specific information noting surface-initiated (top-down) cracking with the crack depth or full-depth cracking was noted. WSDOT observed top-down cracking occurring in the thicker sections, with thinner sections cracking full depth. Top-down cracking generally started within 3 to 8 years of paving for pavement sections that were structurally adequate and were designed for adequate equivalent single-axle loads.

Why it matters

OpenAlex reports 105 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

For years, pavement engineers within the Washington State Department of Transportation (WSDOT) have observed that longitudinal and fatigue (multiple-interconnected) cracks in their thicker asphalt concrete (AC) pavements appeared to crack from the top of the wearing course downward. Often, the cracks stop at the interface between the wearing course and the underlying bituminous layers (a depth of about 50 mm). Studies done elsewhere in the United States and internationally have reported similar results. The results of extensive coring that WSDOT routinely collects in its pavement rehabilitation process were compared in a study. WSDOT normally cores AC pavements to determine thickness for use in mechanistic-empirical design. In addition to coring for AC thickness, specific information noting surface-initiated (top-down) cracking with the crack depth or full-depth cracking was noted. WSDOT observed top-down cracking occurring in the thicker sections, with thinner sections cracking full depth. Top-down cracking generally started within 3 to 8 years of paving for pavement sections that were structurally adequate and were designed for adequate equivalent single-axle loads.

Key concepts: Coring, Cracking, Asphalt, Asphalt concrete, Geotechnical engineering, Wearing course, Forensic engineering, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Top-Down Cracking in Washington State Asphalt Concrete Wearing Courses — Research Paper | ScholarLens