2009•The International Journal of Advanced Manufacturing TechnologyRequires access
A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization
Şeyda Topaloğlu, Gamze Kilincli
Open publisher page 24 citations
Abstract
This record does not include an abstract. Use the full-text link above if available.