Abstract

The Pier E Redevelopment Project targets reconfiguring and combining two irregularly shaped adjacent container terminals to establish a more efficient and environmentally friendly facility. This project aims at replacing the existing wharf structures with modern structures over wharf slope areas stabilized by rock dike revetment or ground improvement. Also, the existing Pier E wharf will be rehabilitated and widened to accommodate a 137'-9" gauge crane, and eventually extended to the south to connect with the wharf at the Pier F terminal. The wharf layout consists of a 4,250-foot long berth composed of 6 wharf segments separated by transverse expansion joints. The design of the wharf considers variation in soil properties and proposed wharf slope stabilization solutions at the different wharf segments. This paper addresses the wharf structural design consierations. A performance based approach was used for the seismic design of the wharf structure for inertia and kinematic loading. The design philosophy objective is to provide a ductile structure with plastic hinges forming in the piles to dissipate the earthquake energy. A series of non-linear static pushover analyses that consider the nonlinear soil behavior were performed to evaluate the structure's displacement capacity and shear demand. The substitute structure method was used to calculate the seismic displacement demands for three levels of ground motions. A non-Linear Time History Analysis was performed for the linked wharf units to verify the displacement demands and determine shear key forces. Pier E utilizes a wider gauge crane with a higher vertical load and translational elastic period of the mode with the maximum participating mass being about 1.3 to 1.5 seconds. The wharf seismic design considered the crane mass impact on the wharf displacement demand.

About this research paper

What this paper is about

The Pier E Redevelopment Project targets reconfiguring and combining two irregularly shaped adjacent container terminals to establish a more efficient and environmentally friendly facility. This project aims at replacing the existing wharf structures with modern structures over wharf slope areas stabilized by rock dike revetment or ground improvement. Also, the existing Pier E wharf will be rehabilitated and widened to accommodate a 137'-9" gauge crane, and eventually extended to the south to connect with the wharf at the Pier F terminal. The wharf layout consists of a 4,250-foot long berth composed of 6 wharf segments separated by transverse expansion joints. The design of the wharf considers variation in soil properties and proposed wharf slope stabilization solutions at the different wharf segments. This paper addresses the wharf structural design consierations. A performance based approach was used for the seismic design of the wharf structure for inertia and kinematic loading. The design philosophy objective is to provide a ductile structure with plastic hinges forming in the piles to dissipate the earthquake energy. A series of non-linear static pushover analyses that consider the nonlinear soil behavior were performed to evaluate the structure's displacement capacity and shear demand. The substitute structure method was used to calculate the seismic displacement demands for three levels of ground motions. A non-Linear Time History Analysis was performed for the linked wharf units to verify the displacement demands and determine shear key forces. Pier E utilizes a wider gauge crane with a higher vertical load and translational elastic period of the mode with the maximum participating mass being about 1.3 to 1.5 seconds. The wharf seismic design considered the crane mass impact on the wharf displacement demand.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Pier E Redevelopment Project targets reconfiguring and combining two irregularly shaped adjacent container terminals to establish a more efficient and environmentally friendly facility. This project aims at replacing the existing wharf structures with modern structures over wharf slope areas stabilized by rock dike revetment or ground improvement. Also, the existing Pier E wharf will be rehabilitated and widened to accommodate a 137'-9" gauge crane, and eventually extended to the south to connect with the wharf at the Pier F terminal. The wharf layout consists of a 4,250-foot long berth composed of 6 wharf segments separated by transverse expansion joints. The design of the wharf considers variation in soil properties and proposed wharf slope stabilization solutions at the different wharf segments. This paper addresses the wharf structural design consierations. A performance based approach was used for the seismic design of the wharf structure for inertia and kinematic loading. The design philosophy objective is to provide a ductile structure with plastic hinges forming in the piles to dissipate the earthquake energy. A series of non-linear static pushover analyses that consider the nonlinear soil behavior were performed to evaluate the structure's displacement capacity and shear demand. The substitute structure method was used to calculate the seismic displacement demands for three levels of ground motions. A non-Linear Time History Analysis was performed for the linked wharf units to verify the displacement demands and determine shear key forces. Pier E utilizes a wider gauge crane with a higher vertical load and translational elastic period of the mode with the maximum participating mass being about 1.3 to 1.5 seconds. The wharf seismic design considered the crane mass impact on the wharf displacement demand.

Key concepts: Wharf, Pier, Structural engineering, Engineering, Geotechnical engineering, Displacement (psychology), Civil engineering, Geology