HISTORY AND FUTURE OUTLOOK OF TRACK MAINTENANCE OF SHINKANSEN

Takefumi MIYAMOTO

Open publisher page 0 citations

Abstract

With the aim of studying track structures and track management methodology, tests were started in 1962 on an experimental track, using vehicles running at 210 km/h, a speed which had never been reached before. Even after the opening of the line, particular efforts have constantly been made with regard to maintenance, so as to keep the lines up to the highest standards required. When laying the extension of the line to Hakata, the use of concrete slab track instead of ballast has enabled JNR to make considerable savings in maintenance costs.

About this research paper

What this paper is about

With the aim of studying track structures and track management methodology, tests were started in 1962 on an experimental track, using vehicles running at 210 km/h, a speed which had never been reached before. Even after the opening of the line, particular efforts have constantly been made with regard to maintenance, so as to keep the lines up to the highest standards required. When laying the extension of the line to Hakata, the use of concrete slab track instead of ballast has enabled JNR to make considerable savings in maintenance costs.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

With the aim of studying track structures and track management methodology, tests were started in 1962 on an experimental track, using vehicles running at 210 km/h, a speed which had never been reached before. Even after the opening of the line, particular efforts have constantly been made with regard to maintenance, so as to keep the lines up to the highest standards required. When laying the extension of the line to Hakata, the use of concrete slab track instead of ballast has enabled JNR to make considerable savings in maintenance costs.

Key concepts: Ballast, Track (disk drive), Engineering, Line (geometry), Railway line, Transport engineering, Slab, Forensic engineering