OPERATION RESULTS OF 1MW RF SYSTEMS FOR THE PEFP 20MEV LINAC

Kyung-Tae Seol, Hyeok-Jung Kwon, H. S. Kim, Y. S. Cho

Open publisher page 0 citations

Abstract

The PEFP (Proton Engineering Frontier Project) 20 MeV linear accelerator is composed of a 3 MeV RFQ and 20 MeV DTL. Two sets of 1 MW, 350 MHz RF systems drive the RFQ and DTL. The RF system can perform a 100 % duty operation. The TH2089F klystron is used as an RF source. During the test operation, only the driving RF signal of the klystron was operated in pulse mode, while the electron beam was maintained in DC mode. The klystron power supplies and cooling systems were also operated in 100 % duty mode. In this paper, we will discuss the operation results of 1 MW RF systems including klystron power supply and cooling system, and propose possible options to improve the operation conditions based on the results.

About this research paper

What this paper is about

The PEFP (Proton Engineering Frontier Project) 20 MeV linear accelerator is composed of a 3 MeV RFQ and 20 MeV DTL. Two sets of 1 MW, 350 MHz RF systems drive the RFQ and DTL. The RF system can perform a 100 % duty operation. The TH2089F klystron is used as an RF source. During the test operation, only the driving RF signal of the klystron was operated in pulse mode, while the electron beam was maintained in DC mode. The klystron power supplies and cooling systems were also operated in 100 % duty mode. In this paper, we will discuss the operation results of 1 MW RF systems including klystron power supply and cooling system, and propose possible options to improve the operation conditions based on the results.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The PEFP (Proton Engineering Frontier Project) 20 MeV linear accelerator is composed of a 3 MeV RFQ and 20 MeV DTL. Two sets of 1 MW, 350 MHz RF systems drive the RFQ and DTL. The RF system can perform a 100 % duty operation. The TH2089F klystron is used as an RF source. During the test operation, only the driving RF signal of the klystron was operated in pulse mode, while the electron beam was maintained in DC mode. The klystron power supplies and cooling systems were also operated in 100 % duty mode. In this paper, we will discuss the operation results of 1 MW RF systems including klystron power supply and cooling system, and propose possible options to improve the operation conditions based on the results.

Key concepts: Klystron, Linear particle accelerator, Duty cycle, Radio frequency, RF power amplifier, Electrical engineering, Physics, Particle accelerator