The PEFP 20MeV proton accelerator is composed of 3 MeV RFQ and 20MeV DTL and two sets of 1 MW, 350 MHz RF system are required for each accelerating structure. The high power RF system for 3 MeV RFQ was already installed and operated to drive the RFQ. The klystron was tested up to 600 kW itself and operated in pulse routinely. The HPRF system for 20 MeV DTL which consists of 4 tanks was installed, and the RF test for 4 tanks has been carried out. Four RF dummy loads for absorbing RF power reflected from each accelerating structure were designed and manufactured. In this paper, the status and test results of the RF system for 20 MeV proton accelerator are discussed.

About this research paper

What this paper is about

The PEFP 20MeV proton accelerator is composed of 3 MeV RFQ and 20MeV DTL and two sets of 1 MW, 350 MHz RF system are required for each accelerating structure. The high power RF system for 3 MeV RFQ was already installed and operated to drive the RFQ. The klystron was tested up to 600 kW itself and operated in pulse routinely. The HPRF system for 20 MeV DTL which consists of 4 tanks was installed, and the RF test for 4 tanks has been carried out. Four RF dummy loads for absorbing RF power reflected from each accelerating structure were designed and manufactured. In this paper, the status and test results of the RF system for 20 MeV proton accelerator are discussed.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The PEFP 20MeV proton accelerator is composed of 3 MeV RFQ and 20MeV DTL and two sets of 1 MW, 350 MHz RF system are required for each accelerating structure. The high power RF system for 3 MeV RFQ was already installed and operated to drive the RFQ. The klystron was tested up to 600 kW itself and operated in pulse routinely. The HPRF system for 20 MeV DTL which consists of 4 tanks was installed, and the RF test for 4 tanks has been carried out. Four RF dummy loads for absorbing RF power reflected from each accelerating structure were designed and manufactured. In this paper, the status and test results of the RF system for 20 MeV proton accelerator are discussed.

Key concepts: Klystron, Radio frequency, RF power amplifier, Proton, Nuclear engineering, Power (physics), Physics, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Status and Test Results of HPRF System for PEFP — Research Paper | ScholarLens