1979•IEEE Transactions on Vehicular TechnologyRequires access

A rail-transit people-mover headway comparison

J.H. Auer

Open publisher page 2 citations

Abstract

For many years, General Railway Signal Company has supplied control systems for conventional rail transit. Headways for these systems range from minutes or hours down to as low as 75 s. In the last few years, the company has supplied control systems for people-mover applications in which minimum headways of 10-20 s have been achieved. There are many factors working together to permit achievement of this large reduction in headway. These factors are identified and evaluated for their impact on capacity. The fundamentals underlying the disparity in headway are discussed from the viewpoint of potential for increased capacity of rail transit.

About this research paper

What this paper is about

For many years, General Railway Signal Company has supplied control systems for conventional rail transit. Headways for these systems range from minutes or hours down to as low as 75 s. In the last few years, the company has supplied control systems for people-mover applications in which minimum headways of 10-20 s have been achieved. There are many factors working together to permit achievement of this large reduction in headway. These factors are identified and evaluated for their impact on capacity. The fundamentals underlying the disparity in headway are discussed from the viewpoint of potential for increased capacity of rail transit.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

For many years, General Railway Signal Company has supplied control systems for conventional rail transit. Headways for these systems range from minutes or hours down to as low as 75 s. In the last few years, the company has supplied control systems for people-mover applications in which minimum headways of 10-20 s have been achieved. There are many factors working together to permit achievement of this large reduction in headway. These factors are identified and evaluated for their impact on capacity. The fundamentals underlying the disparity in headway are discussed from the viewpoint of potential for increased capacity of rail transit.

Key concepts: Headway, Rail transit, Transport engineering, Engineering, Transit (satellite), Urban rail transit, Automotive engineering, Transit system

Related papers

Back to paper searchBrowse research topicsOriginal source
A rail-transit people-mover headway comparison — Research Paper | ScholarLens