1997Journal of Construction Engineering and ManagementRequires access

The Architect/Engineer's Role in Rehabilitation Work

Osama E. K. Daoud

Open publisher page 30 citations

Abstract

Rehabilitation projects often suffer from delays and escalating costs. This may be attributed to a high degree of uncertainty in defining the scope of work for these projects during the design stage. This is particularly true for rehabilitation work on structures that suffered a catastrophe such as fire or war damage. Reasons for these problems are reviewed with emphasis on the role of the architect/engineer (A/E) in avoiding underestimation of required work during the stages of the project. Many common problems could be avoided if a more thorough survey was conducted of the damaged building at the initial design stage. Changes to the scope of work during the construction stage may cause serious delays and cost overruns. Recommendations are given to minimize ambiguities in the scope of work and avoid disputes among the parties to the contract. This can be achieved by employing an experienced A/E and by making sound decisions throughout the project span.

About this research paper

What this paper is about

Rehabilitation projects often suffer from delays and escalating costs. This may be attributed to a high degree of uncertainty in defining the scope of work for these projects during the design stage. This is particularly true for rehabilitation work on structures that suffered a catastrophe such as fire or war damage. Reasons for these problems are reviewed with emphasis on the role of the architect/engineer (A/E) in avoiding underestimation of required work during the stages of the project. Many common problems could be avoided if a more thorough survey was conducted of the damaged building at the initial design stage. Changes to the scope of work during the construction stage may cause serious delays and cost overruns. Recommendations are given to minimize ambiguities in the scope of work and avoid disputes among the parties to the contract. This can be achieved by employing an experienced A/E and by making sound decisions throughout the project span.

Why it matters

OpenAlex reports 30 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Rehabilitation projects often suffer from delays and escalating costs. This may be attributed to a high degree of uncertainty in defining the scope of work for these projects during the design stage. This is particularly true for rehabilitation work on structures that suffered a catastrophe such as fire or war damage. Reasons for these problems are reviewed with emphasis on the role of the architect/engineer (A/E) in avoiding underestimation of required work during the stages of the project. Many common problems could be avoided if a more thorough survey was conducted of the damaged building at the initial design stage. Changes to the scope of work during the construction stage may cause serious delays and cost overruns. Recommendations are given to minimize ambiguities in the scope of work and avoid disputes among the parties to the contract. This can be achieved by employing an experienced A/E and by making sound decisions throughout the project span.

Key concepts: Scope (computer science), Work (physics), Statement of work, Rehabilitation, Risk analysis (engineering), Construction engineering, Architectural engineering, Engineering