2005•Optimization of Capital ConstructionRequires access

Compare with Three Construction Models of PM、CM and PMC

Sun Wen-jian

Open publisher page 0 citations

Abstract

PM,CM and PMC are three different construction models, shaped in different period and market condition with their own character and applying scope. The paper recommended the three kinds of model from their basic meanings and characteristic, and compared each other with the aspect of organization, contract, work scope, risk and responsibility. After analyzing the three models of their advantage and applying scope, the paper emphasized different model should be choiced according to the project actual conditions.

About this research paper

What this paper is about

PM,CM and PMC are three different construction models, shaped in different period and market condition with their own character and applying scope. The paper recommended the three kinds of model from their basic meanings and characteristic, and compared each other with the aspect of organization, contract, work scope, risk and responsibility. After analyzing the three models of their advantage and applying scope, the paper emphasized different model should be choiced according to the project actual conditions.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

PM,CM and PMC are three different construction models, shaped in different period and market condition with their own character and applying scope. The paper recommended the three kinds of model from their basic meanings and characteristic, and compared each other with the aspect of organization, contract, work scope, risk and responsibility. After analyzing the three models of their advantage and applying scope, the paper emphasized different model should be choiced according to the project actual conditions.

Key concepts: Scope (computer science), Statement of work, Character (mathematics), Work (physics), Computer science, Engineering, Operations management, Risk analysis (engineering)