2014Unpublished venueRequires access

Cycle time reduction in assembly line through layout improvement, ergonomics analysis and lean principles

Rahul Pulkurte, Ravindran Masilamani, Sarvesh Sonpatki, Rajesh J. Dhake

Open publisher page 7 citations

Abstract

Line Balancing is leveling the workload across all processes in a line or value stream to remove bottlenecks and excess capacity. The objective of assembly line balancing is to assign processes and tasks to the individual work station such that the total time required at each workstation is approximately same and equal to or below the Takt time. This paper mainly focuses on improving overall efficiency of multi-model assembly line by identifying and eliminating non-value added activities, making alterations in work stations, layout improvements to eliminate operator movements, and reduction of work content through postural analysis of operators using REBA (Rapid Entire Body Assessment) analysis.

About this research paper

What this paper is about

Line Balancing is leveling the workload across all processes in a line or value stream to remove bottlenecks and excess capacity. The objective of assembly line balancing is to assign processes and tasks to the individual work station such that the total time required at each workstation is approximately same and equal to or below the Takt time. This paper mainly focuses on improving overall efficiency of multi-model assembly line by identifying and eliminating non-value added activities, making alterations in work stations, layout improvements to eliminate operator movements, and reduction of work content through postural analysis of operators using REBA (Rapid Entire Body Assessment) analysis.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Line Balancing is leveling the workload across all processes in a line or value stream to remove bottlenecks and excess capacity. The objective of assembly line balancing is to assign processes and tasks to the individual work station such that the total time required at each workstation is approximately same and equal to or below the Takt time. This paper mainly focuses on improving overall efficiency of multi-model assembly line by identifying and eliminating non-value added activities, making alterations in work stations, layout improvements to eliminate operator movements, and reduction of work content through postural analysis of operators using REBA (Rapid Entire Body Assessment) analysis.

Key concepts: Workload, Workstation, Reduction (mathematics), Line (geometry), Work (physics), Value stream mapping, Assembly line, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Cycle time reduction in assembly line through layout improvement, ergonomics analysis and lean principles — Research Paper | ScholarLens