Cycle time reduction in assembly line through layout improvement, ergonomics analysis and lean principles
Rahul Pulkurte, Ravindran Masilamani, Sarvesh Sonpatki, Rajesh J. Dhake
Abstract
Rahul Pulkurte, Ravindran Masilamani, Sarvesh Sonpatki, Rajesh J. Dhake
Abstract
Line Balancing is leveling the workload across all processes in a line or value stream to remove bottlenecks and excess capacity. The objective of assembly line balancing is to assign processes and tasks to the individual work station such that the total time required at each workstation is approximately same and equal to or below the Takt time. This paper mainly focuses on improving overall efficiency of multi-model assembly line by identifying and eliminating non-value added activities, making alterations in work stations, layout improvements to eliminate operator movements, and reduction of work content through postural analysis of operators using REBA (Rapid Entire Body Assessment) analysis.
OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Line Balancing is leveling the workload across all processes in a line or value stream to remove bottlenecks and excess capacity. The objective of assembly line balancing is to assign processes and tasks to the individual work station such that the total time required at each workstation is approximately same and equal to or below the Takt time. This paper mainly focuses on improving overall efficiency of multi-model assembly line by identifying and eliminating non-value added activities, making alterations in work stations, layout improvements to eliminate operator movements, and reduction of work content through postural analysis of operators using REBA (Rapid Entire Body Assessment) analysis.
Key concepts: Workload, Workstation, Reduction (mathematics), Line (geometry), Work (physics), Value stream mapping, Assembly line, Computer science