2013arXiv (Cornell University)Open access

Positron Source Simulations for ILC 1 TeV Upgrade

Andriy Ushakov, Gudrid Moortgat‐Pick, Sabine Riemann, Wanming Liu, Wei Gai

Open full text 0 citations

Abstract

The generation and capture of polarized positrons at a source with a superconducting helical undulator having 4.3 cm period and 500 GeV electron drive beam have been simulated. The positron polarization has been calculated for the different undulator K values (up to K = 2.5). Without applying a photon collimator, the maximal polarization of positrons is about 25% for 231 meters active magnet length of undulator with K = 0.7. Using an undulator with K = 2.5 and a collimator with an aperture radius of 0.9 mm results in increase of positron polarization to 54%. The energy deposition, temperature rise and stress induced by high intense photon beam in the rotated titanium-alloy target have been estimated. The maximal thermal stress in the target is about 224 MPa for the source with photon collimation to achieve a positron polarization of 54%.

Open-access reader

About this research paper

What this paper is about

The generation and capture of polarized positrons at a source with a superconducting helical undulator having 4.3 cm period and 500 GeV electron drive beam have been simulated. The positron polarization has been calculated for the different undulator K values (up to K = 2.5). Without applying a photon collimator, the maximal polarization of positrons is about 25% for 231 meters active magnet length of undulator with K = 0.7. Using an undulator with K = 2.5 and a collimator with an aperture radius of 0.9 mm results in increase of positron polarization to 54%. The energy deposition, temperature rise and stress induced by high intense photon beam in the rotated titanium-alloy target have been estimated. The maximal thermal stress in the target is about 224 MPa for the source with photon collimation to achieve a positron polarization of 54%.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The generation and capture of polarized positrons at a source with a superconducting helical undulator having 4.3 cm period and 500 GeV electron drive beam have been simulated. The positron polarization has been calculated for the different undulator K values (up to K = 2.5). Without applying a photon collimator, the maximal polarization of positrons is about 25% for 231 meters active magnet length of undulator with K = 0.7. Using an undulator with K = 2.5 and a collimator with an aperture radius of 0.9 mm results in increase of positron polarization to 54%. The energy deposition, temperature rise and stress induced by high intense photon beam in the rotated titanium-alloy target have been estimated. The maximal thermal stress in the target is about 224 MPa for the source with photon collimation to achieve a positron polarization of 54%.

Key concepts: Undulator, Positron, Physics, Collimator, Photon, Nuclear physics, Polarization (electrochemistry), Optics

Related papers

Back to paper searchBrowse research topicsOriginal source
Positron Source Simulations for ILC 1 TeV Upgrade — Research Paper | ScholarLens