POLYMER CONCRETE FOR PRECAST REPAIR OF CONTINUOUSLY REINFORCED CONCRETE PAVEMENT ON IH 30, NEAR MT. PLEASANT

A H Meyer, B F McCullough, David W. Fowler

Open publisher page 3 citations

Abstract

This report describes two punchout repairs made in a continously reinforced concrete pavement (CRCP) using precast portland cement panels. The two repairs, one 12 foot by 12 foot, the other 6 foot by 6 foot, were completed and opened to traffic in one afternoon. This technique provides a rapid method of repair that produces a repair that is structurally as good or better than the surrounding pavement. With a trained crew, the repair time can be reduced and thus reduce lane closure time. Since lane closure time is a critical consideration in high volume highways, this method will be cost effective in those areas. (FHWA)

About this research paper

What this paper is about

This report describes two punchout repairs made in a continously reinforced concrete pavement (CRCP) using precast portland cement panels. The two repairs, one 12 foot by 12 foot, the other 6 foot by 6 foot, were completed and opened to traffic in one afternoon. This technique provides a rapid method of repair that produces a repair that is structurally as good or better than the surrounding pavement. With a trained crew, the repair time can be reduced and thus reduce lane closure time. Since lane closure time is a critical consideration in high volume highways, this method will be cost effective in those areas. (FHWA)

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This report describes two punchout repairs made in a continously reinforced concrete pavement (CRCP) using precast portland cement panels. The two repairs, one 12 foot by 12 foot, the other 6 foot by 6 foot, were completed and opened to traffic in one afternoon. This technique provides a rapid method of repair that produces a repair that is structurally as good or better than the surrounding pavement. With a trained crew, the repair time can be reduced and thus reduce lane closure time. Since lane closure time is a critical consideration in high volume highways, this method will be cost effective in those areas. (FHWA)

Key concepts: Precast concrete, Portland cement, Forensic engineering, Geotechnical engineering, Structural engineering, Engineering, Cement, Materials science