2009Journal of Performance of Constructed FacilitiesOpen access

Evaluation Study on the Instrumentation System of Cindere Dam

A. Melih Yanmaz, O. Ilke Sezgin

Open full text 8 citations

Abstract

The first hardfill dam in Turkey, Cindere Dam, has recently been constructed and a number of instruments have been installed. The aim of this study is to review the capability of the current instrumentation system and to observe the feasibility of possible alternative measurement systems. To this end, the current instrumentation system has been evaluated as a whole with reference to the parameters measured, instruments, and data acquisition system. Afterward, an alternative instrumentation system was developed by considering additional parameters and instruments to the current system. Furthermore, each instrumentation system equipped with manual and automatic data acquisition systems was considered. The comparison between the current and alternative instrumentation systems was also carried out in terms of technical and economical aspects. Although the current instrumentation system was found to be satisfactory according to the commonly used dam instrumentation practices, it was observed that the alternative system promotes the current one in various aspects without increasing the cost significantly.

About this research paper

What this paper is about

The first hardfill dam in Turkey, Cindere Dam, has recently been constructed and a number of instruments have been installed. The aim of this study is to review the capability of the current instrumentation system and to observe the feasibility of possible alternative measurement systems. To this end, the current instrumentation system has been evaluated as a whole with reference to the parameters measured, instruments, and data acquisition system. Afterward, an alternative instrumentation system was developed by considering additional parameters and instruments to the current system. Furthermore, each instrumentation system equipped with manual and automatic data acquisition systems was considered. The comparison between the current and alternative instrumentation systems was also carried out in terms of technical and economical aspects. Although the current instrumentation system was found to be satisfactory according to the commonly used dam instrumentation practices, it was observed that the alternative system promotes the current one in various aspects without increasing the cost significantly.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The first hardfill dam in Turkey, Cindere Dam, has recently been constructed and a number of instruments have been installed. The aim of this study is to review the capability of the current instrumentation system and to observe the feasibility of possible alternative measurement systems. To this end, the current instrumentation system has been evaluated as a whole with reference to the parameters measured, instruments, and data acquisition system. Afterward, an alternative instrumentation system was developed by considering additional parameters and instruments to the current system. Furthermore, each instrumentation system equipped with manual and automatic data acquisition systems was considered. The comparison between the current and alternative instrumentation systems was also carried out in terms of technical and economical aspects. Although the current instrumentation system was found to be satisfactory according to the commonly used dam instrumentation practices, it was observed that the alternative system promotes the current one in various aspects without increasing the cost significantly.

Key concepts: Instrumentation (computer programming), Current (fluid), Engineering, Data acquisition, Systems engineering, Computer science, Electrical engineering, Operating system

Related papers

Back to paper searchBrowse research topicsOriginal source
Evaluation Study on the Instrumentation System of Cindere Dam — Research Paper | ScholarLens