Analysis using a new bid index about the tendency of the bid price in the competitive bidding process at public construction.
Tatsunori Makizumi, Tetsumasa TANAKA
Abstract
Open-access reader
Tatsunori Makizumi, Tetsumasa TANAKA
Abstract
Open-access reader
In this paper, a new bid index different from the successful bid rate, which evaluates adequacy of the bid price in a bidding process of selecting contractor to do an infrastructure construction, is proposed.In this bid index, a predetermined bid value is correspond to 100% and a limit price necessary to survey is 0%, so that the bid price almost lower than the cost is expressed by the negative value. Using this index, all results of the competitive bidding process taken in ministry of land, infrastructure and Transport after September of 2005, are analysed.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In this paper, a new bid index different from the successful bid rate, which evaluates adequacy of the bid price in a bidding process of selecting contractor to do an infrastructure construction, is proposed.In this bid index, a predetermined bid value is correspond to 100% and a limit price necessary to survey is 0%, so that the bid price almost lower than the cost is expressed by the negative value. Using this index, all results of the competitive bidding process taken in ministry of land, infrastructure and Transport after September of 2005, are analysed.
Key concepts: Bidding, Construction bidding, Bid price, Index (typography), Real-time bidding, Christian ministry, Value (mathematics), Business