Strategic Petroleum Reserve construction ends first phase
Robert Lawson
Abstract
Robert Lawson
Abstract
As the $900 million Phase 1 construction nears completion, the US Strategic Petroleum Reserve (SPR) underground storage capacity amounts to 248 million bbl, about half the amount that will be available after Phase 2 is completed. About 90.2 million bbl of oil are stored underground, and an additional 1.5 million bbl are stored in surface tanks, at an average cost of just under $3.50/bbl. Dravo Utility Constructors Inc. is the operations and maintenance contractor on the project. In Phase 1, five salt-dome storage complexes and one marine terminal were constructed. The facilities are organized into three basic storage/retrieval systems: the Bayou Choctaw and Weeks Island storage complexes in Louisiana which are connected to the St. James, LA, marine terminal; the West Hackberry and Sulphur Mines storage complexes in Louisiana; and the Bryan Mound storage complex in Texas. The crude oil stored in the complexes is segregated by sulfur content. When the reserves are full, about 70% of the oil will be high-sulfur crude. The design total drawdown rate from the three storage systems is now 1.7 million bbl/day. The entire SPR operation is directed from New Orleans. The six SPR storage facilities are described.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
As the $900 million Phase 1 construction nears completion, the US Strategic Petroleum Reserve (SPR) underground storage capacity amounts to 248 million bbl, about half the amount that will be available after Phase 2 is completed. About 90.2 million bbl of oil are stored underground, and an additional 1.5 million bbl are stored in surface tanks, at an average cost of just under $3.50/bbl. Dravo Utility Constructors Inc. is the operations and maintenance contractor on the project. In Phase 1, five salt-dome storage complexes and one marine terminal were constructed. The facilities are organized into three basic storage/retrieval systems: the Bayou Choctaw and Weeks Island storage complexes in Louisiana which are connected to the St. James, LA, marine terminal; the West Hackberry and Sulphur Mines storage complexes in Louisiana; and the Bryan Mound storage complex in Texas. The crude oil stored in the complexes is segregated by sulfur content. When the reserves are full, about 70% of the oil will be high-sulfur crude. The design total drawdown rate from the three storage systems is now 1.7 million bbl/day. The entire SPR operation is directed from New Orleans. The six SPR storage facilities are described.
Key concepts: Petroleum, Oil storage, Storage tank, Crude oil, Energy source, Environmental science, Fossil fuel, Waste management