1995SPE Reservoir EngineeringRequires access

Polymer Flood of the Rapdan Pool

Malcolm Pitts, Tom Campbell, H. Surkalo, Kon Wyatt

Open publisher page 24 citations

Abstract

Summary A polymer-flood pilot project in the Rapdan field is documented from laboratory design and numerical simulation to production performance and projected economics. The Rapdan field produces 10-mPa · s oil from the Upper Shaunavon sand at a reservoir temperature of 55 °C. Average permeability is 0.114 μm2, average porosity is 18%, and Dykstra-Parsons coefficient is 0.8. The field was discovered in 1953, and waterflood began in 1962. In Jan. 1986, a polymer pilot was initiated in a portion of the field with a PV of 456 × 104 m3. The pilot consists of 13 producers and 5 injectors drilled on 162 × 103-m2 spacing. By Dec. 1994, 43% PV of a 21-mPa · s polymer solution had been injected into a confined, central five spot (Wells 12-12 and 12-12A). The oil cut increased from a stable value of 8% during the waterflood to a peak value of 25%. The corresponding daily oil production increased from 8 to 28 m3/d. The performance of the total project oil production increased from 65 m3/d at an oil cut of 18% to a peak production of 180 m3/d at an oil cut of 36%. Production rate has declined from 140 m3/d in 1991 to 106 m3/d in Dec. 1994, with a corresponding oil-cut decline from 25% to 20%.

About this research paper

What this paper is about

Summary A polymer-flood pilot project in the Rapdan field is documented from laboratory design and numerical simulation to production performance and projected economics. The Rapdan field produces 10-mPa · s oil from the Upper Shaunavon sand at a reservoir temperature of 55 °C. Average permeability is 0.114 μm2, average porosity is 18%, and Dykstra-Parsons coefficient is 0.8. The field was discovered in 1953, and waterflood began in 1962. In Jan. 1986, a polymer pilot was initiated in a portion of the field with a PV of 456 × 104 m3. The pilot consists of 13 producers and 5 injectors drilled on 162 × 103-m2 spacing. By Dec. 1994, 43% PV of a 21-mPa · s polymer solution had been injected into a confined, central five spot (Wells 12-12 and 12-12A). The oil cut increased from a stable value of 8% during the waterflood to a peak value of 25%. The corresponding daily oil production increased from 8 to 28 m3/d. The performance of the total project oil production increased from 65 m3/d at an oil cut of 18% to a peak production of 180 m3/d at an oil cut of 36%. Production rate has declined from 140 m3/d in 1991 to 106 m3/d in Dec. 1994, with a corresponding oil-cut decline from 25% to 20%.

Why it matters

OpenAlex reports 24 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Summary A polymer-flood pilot project in the Rapdan field is documented from laboratory design and numerical simulation to production performance and projected economics. The Rapdan field produces 10-mPa · s oil from the Upper Shaunavon sand at a reservoir temperature of 55 °C. Average permeability is 0.114 μm2, average porosity is 18%, and Dykstra-Parsons coefficient is 0.8. The field was discovered in 1953, and waterflood began in 1962. In Jan. 1986, a polymer pilot was initiated in a portion of the field with a PV of 456 × 104 m3. The pilot consists of 13 producers and 5 injectors drilled on 162 × 103-m2 spacing. By Dec. 1994, 43% PV of a 21-mPa · s polymer solution had been injected into a confined, central five spot (Wells 12-12 and 12-12A). The oil cut increased from a stable value of 8% during the waterflood to a peak value of 25%. The corresponding daily oil production increased from 8 to 28 m3/d. The performance of the total project oil production increased from 65 m3/d at an oil cut of 18% to a peak production of 180 m3/d at an oil cut of 36%. Production rate has declined from 140 m3/d in 1991 to 106 m3/d in Dec. 1994, with a corresponding oil-cut decline from 25% to 20%.

Key concepts: Oil in place, Well stimulation, Oil production, Petroleum engineering, Oil field, Reservoir engineering, Petroleum, Injector