Design and Construction of the My Thuan Bridge, Vietnam

E J Rogers

Open publisher page 0 citations

Abstract

The My Thuan Bridge was opened to traffic on 21 May 2000, some eight months ahead of the original schedule. It is the first crossing of the massive Mekong River in Vietnam, the first cable stayed and the largest span bridge in the country. The $90 million bridge was jointly funded by the governments of Australia and Vietnam and designed and supervised by Maunsell Mclntyre Pty Ltd. The structure is located approximately 125 km from Ho Chi Minh City on National Highway Number 1 and has an overall length of 1535 m with a central 350 m span cable stayed bridge providing a 37.5 m high navigation clearance for shipping to Phnom Penh in Cambodia. It features 100 m deep large diameter bored pile foundations, load tested to 30 MN, Super Tee beam approaches with spans of 40 m and damping devices built in to the cable anchorages to eliminate cable vibrations. This paper describes the background to the project and provides an insight into its design and construction. (a) For the covering entry of this conference, please see ITRD E204289.

About this research paper

What this paper is about

The My Thuan Bridge was opened to traffic on 21 May 2000, some eight months ahead of the original schedule. It is the first crossing of the massive Mekong River in Vietnam, the first cable stayed and the largest span bridge in the country. The $90 million bridge was jointly funded by the governments of Australia and Vietnam and designed and supervised by Maunsell Mclntyre Pty Ltd. The structure is located approximately 125 km from Ho Chi Minh City on National Highway Number 1 and has an overall length of 1535 m with a central 350 m span cable stayed bridge providing a 37.5 m high navigation clearance for shipping to Phnom Penh in Cambodia. It features 100 m deep large diameter bored pile foundations, load tested to 30 MN, Super Tee beam approaches with spans of 40 m and damping devices built in to the cable anchorages to eliminate cable vibrations. This paper describes the background to the project and provides an insight into its design and construction. (a) For the covering entry of this conference, please see ITRD E204289.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The My Thuan Bridge was opened to traffic on 21 May 2000, some eight months ahead of the original schedule. It is the first crossing of the massive Mekong River in Vietnam, the first cable stayed and the largest span bridge in the country. The $90 million bridge was jointly funded by the governments of Australia and Vietnam and designed and supervised by Maunsell Mclntyre Pty Ltd. The structure is located approximately 125 km from Ho Chi Minh City on National Highway Number 1 and has an overall length of 1535 m with a central 350 m span cable stayed bridge providing a 37.5 m high navigation clearance for shipping to Phnom Penh in Cambodia. It features 100 m deep large diameter bored pile foundations, load tested to 30 MN, Super Tee beam approaches with spans of 40 m and damping devices built in to the cable anchorages to eliminate cable vibrations. This paper describes the background to the project and provides an insight into its design and construction. (a) For the covering entry of this conference, please see ITRD E204289.

Key concepts: Bridge (graph theory), Ho chi minh, Engineering, Span (engineering), Civil engineering, Forensic engineering, Geography, Cartography

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and Construction of the My Thuan Bridge, Vietnam — Research Paper | ScholarLens