Design of the Third Karnaphuli Bridge
David Astin
Abstract
David Astin
Abstract
The Third Karnaphuli Bridge is the first major cable-supported crossing to be constructed in Bangladesh. It spans the KarnaphuliRiver immediately to the north of Chittagong port. The main bridge in- cludes three 200 m long main river spans with an extradosedprestressed concrete single cell box girder deck constructed by the balanced cantilever method.The bridge is founded on alluvial soil affected by deep soil liquefaction and river scour. The foundations of the main bridge incorporate 3 m diameter bored cast in situ piles which were base grouted post-construction. Construction of the bridge commenced in July 2007 and the crossing was opened to traffic in July 2010.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The Third Karnaphuli Bridge is the first major cable-supported crossing to be constructed in Bangladesh. It spans the KarnaphuliRiver immediately to the north of Chittagong port. The main bridge in- cludes three 200 m long main river spans with an extradosedprestressed concrete single cell box girder deck constructed by the balanced cantilever method.The bridge is founded on alluvial soil affected by deep soil liquefaction and river scour. The foundations of the main bridge incorporate 3 m diameter bored cast in situ piles which were base grouted post-construction. Construction of the bridge commenced in July 2007 and the crossing was opened to traffic in July 2010.
Key concepts: Bridge (graph theory), Alluvium, Geotechnical engineering, Deck, Engineering, Civil engineering, Geology, Forensic engineering