2014Journal of Quality in Maintenance EngineeringOpen access

Downtime analysis of drilling machines and suggestions for improvements

Hussan Al-Chalabi, Jan Lundberg, Andi Wijaya, Behzad Ghodrati

Open full text 28 citations

Abstract

Purpose – The purpose of this paper is to analyse and compare the downtime of four drilling machines used in two underground mines in Sweden. The downtime of these machines was compared to show what problems affect downtime and which strategies should be applied to reduce it. Design/methodology/approach – The study collects failure data from a two-year period for four drilling machines and performs reliability analysis. It also performs downtime analysis utilising a log-log diagram with a confidence interval. Findings – There are notable differences in the downtime of most of the studied components for all machines. The hoses and feeder have relatively high downtime. Depending on their downtime, the significant components can be ranked in three groups. The downtime of the studied components is due to reliability problems. The study suggests the need to improve the reliability of critical components to reduce the downtime of drilling machines. Originality/value – The method of analysing the downtime, identifying dominant factors and the interval estimation for the downtime, has never been studied on drilling machines. The research proposed in this paper provides a general method to link downtime analysis with potential component improvement. To increase the statistical accuracy; four case studies was performed in two different mines with completely different working environment and ore properties. Using the above method showed which components need to be improved and suggestions for improvement was proposed and will be implemented accordingly.

About this research paper

What this paper is about

Purpose – The purpose of this paper is to analyse and compare the downtime of four drilling machines used in two underground mines in Sweden. The downtime of these machines was compared to show what problems affect downtime and which strategies should be applied to reduce it. Design/methodology/approach – The study collects failure data from a two-year period for four drilling machines and performs reliability analysis. It also performs downtime analysis utilising a log-log diagram with a confidence interval. Findings – There are notable differences in the downtime of most of the studied components for all machines. The hoses and feeder have relatively high downtime. Depending on their downtime, the significant components can be ranked in three groups. The downtime of the studied components is due to reliability problems. The study suggests the need to improve the reliability of critical components to reduce the downtime of drilling machines. Originality/value – The method of analysing the downtime, identifying dominant factors and the interval estimation for the downtime, has never been studied on drilling machines. The research proposed in this paper provides a general method to link downtime analysis with potential component improvement. To increase the statistical accuracy; four case studies was performed in two different mines with completely different working environment and ore properties. Using the above method showed which components need to be improved and suggestions for improvement was proposed and will be implemented accordingly.

Why it matters

OpenAlex reports 28 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Purpose – The purpose of this paper is to analyse and compare the downtime of four drilling machines used in two underground mines in Sweden. The downtime of these machines was compared to show what problems affect downtime and which strategies should be applied to reduce it. Design/methodology/approach – The study collects failure data from a two-year period for four drilling machines and performs reliability analysis. It also performs downtime analysis utilising a log-log diagram with a confidence interval. Findings – There are notable differences in the downtime of most of the studied components for all machines. The hoses and feeder have relatively high downtime. Depending on their downtime, the significant components can be ranked in three groups. The downtime of the studied components is due to reliability problems. The study suggests the need to improve the reliability of critical components to reduce the downtime of drilling machines. Originality/value – The method of analysing the downtime, identifying dominant factors and the interval estimation for the downtime, has never been studied on drilling machines. The research proposed in this paper provides a general method to link downtime analysis with potential component improvement. To increase the statistical accuracy; four case studies was performed in two different mines with completely different working environment and ore properties. Using the above method showed which components need to be improved and suggestions for improvement was proposed and will be implemented accordingly.

Key concepts: Downtime, Reliability engineering, Reliability (semiconductor), Engineering, Interval (graph theory), Computer science, Mathematics, Power (physics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Downtime analysis of drilling machines and suggestions for improvements — Research Paper | ScholarLens