Evaluating Water Coning Control for Horizontal Well in Bottom-Water Sandstone Reservoirs by Numerical Method
Rong Wang, Kui Zhang, Yong Duan, Ting Kuan Cao
Abstract
Rong Wang, Kui Zhang, Yong Duan, Ting Kuan Cao
Abstract
Horizontal well is the main technology to develop bottom-water sandstone reservoirs. Water coning has a significant influence on development effect, and shut-in coning control is one of coning suppression methods. Based on the geological model of a given oilfield, this paper has made an evaluation of water coning control by numerical simulation. It can be concluded that the method of shut-in coning control is effective for low water cut wells. When shutting in, the lower the water cut is, the greater decline extent of water cut can be obtained and the higher cumulative oil production can be achieved after well reopening. The longer the close time is, the better water coning control effect can be acquired, however it will affect oil production undoubtly. When horizontal well enters into high water cut stage, shut-in coning control not only has almost no effect, but also has a negative impact on the normal oil production.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Horizontal well is the main technology to develop bottom-water sandstone reservoirs. Water coning has a significant influence on development effect, and shut-in coning control is one of coning suppression methods. Based on the geological model of a given oilfield, this paper has made an evaluation of water coning control by numerical simulation. It can be concluded that the method of shut-in coning control is effective for low water cut wells. When shutting in, the lower the water cut is, the greater decline extent of water cut can be obtained and the higher cumulative oil production can be achieved after well reopening. The longer the close time is, the better water coning control effect can be acquired, however it will affect oil production undoubtly. When horizontal well enters into high water cut stage, shut-in coning control not only has almost no effect, but also has a negative impact on the normal oil production.
Key concepts: Water cut, Petroleum engineering, Bottom water, Oil production, Geology, Water level, Shut down, Computer simulation