2021•IOP Conference Series Earth and Environmental ScienceOpen access

Research on the adjustment boundary of well pattern injection-production structure in the eastern area of South Second District

Ma Ning

Open full text 0 citations

Abstract

Abstract Since the “Eighth Five-Year Plan”, the practice of extracting fluid from low-water-cut wells and controlling fluid from high-water-cut wells has controlled the increase in water cut and the growth rate of fluid production, and achieved the goal of stabilizing oil and water. At present, the water cut of each well pattern is basically close, and the potential for structural adjustment is small. The effect of continuing to adhere to the previous adjustment of injection-production structure is not obvious. It is necessary to revise the injection-production structure adjustment policy to achieve balanced production of various oil layers and control production decline.

Open-access reader

About this research paper

What this paper is about

Abstract Since the “Eighth Five-Year Plan”, the practice of extracting fluid from low-water-cut wells and controlling fluid from high-water-cut wells has controlled the increase in water cut and the growth rate of fluid production, and achieved the goal of stabilizing oil and water. At present, the water cut of each well pattern is basically close, and the potential for structural adjustment is small. The effect of continuing to adhere to the previous adjustment of injection-production structure is not obvious. It is necessary to revise the injection-production structure adjustment policy to achieve balanced production of various oil layers and control production decline.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract Since the “Eighth Five-Year Plan”, the practice of extracting fluid from low-water-cut wells and controlling fluid from high-water-cut wells has controlled the increase in water cut and the growth rate of fluid production, and achieved the goal of stabilizing oil and water. At present, the water cut of each well pattern is basically close, and the potential for structural adjustment is small. The effect of continuing to adhere to the previous adjustment of injection-production structure is not obvious. It is necessary to revise the injection-production structure adjustment policy to achieve balanced production of various oil layers and control production decline.

Key concepts: Water cut, Production (economics), Oil production, Petroleum engineering, Water injection (oil production), Production rate, Boundary (topology), Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on the adjustment boundary of well pattern injection-production structure in the eastern area of South Second District — Research Paper | ScholarLens