Wolf Creek Feedwater Heater Repair

Bruce W. Schafer, Stan Wahlmeier

Open publisher page 1 citations

Abstract

Since 1990, an increasing number of the 304 SST feedwater heater tubes in the number 1 and 2 feedwater heaters (six heaters total) at the Wolf Creek Nuclear Power Plant have experienced failure due to fretting wear within the drain cooler region. Tube damage was due to thin end plate design resulting in tube wear at the end plate and support plate locations. Despite performing extensive eddy current inspections and preventative plugging on the heaters, the damage mechanism is powerful enough that tube leaks were continuing to occur while at power, resulting in the forced shutdown of a string of heaters for plugging. As an option to feedwater heater replacement, a method of reducing the tube-to-end plate gap, by expanding the tube into very close contact with the end plate, and sleeving tubes with wear indications was evaluated. Based on an evaluation of outage schedule time and cost, it was decided that the option of repairing the feedwater heaters, rather than replacing them, would be pursued. During Wolf Creek’s September 2000 refueling outage, Framatome ANP performed feedwater heater tube plug removal, tube expansions at the end plate, and sleeving. All work on-site was performed within the outage scheduling constraints.

About this research paper

What this paper is about

Since 1990, an increasing number of the 304 SST feedwater heater tubes in the number 1 and 2 feedwater heaters (six heaters total) at the Wolf Creek Nuclear Power Plant have experienced failure due to fretting wear within the drain cooler region. Tube damage was due to thin end plate design resulting in tube wear at the end plate and support plate locations. Despite performing extensive eddy current inspections and preventative plugging on the heaters, the damage mechanism is powerful enough that tube leaks were continuing to occur while at power, resulting in the forced shutdown of a string of heaters for plugging. As an option to feedwater heater replacement, a method of reducing the tube-to-end plate gap, by expanding the tube into very close contact with the end plate, and sleeving tubes with wear indications was evaluated. Based on an evaluation of outage schedule time and cost, it was decided that the option of repairing the feedwater heaters, rather than replacing them, would be pursued. During Wolf Creek’s September 2000 refueling outage, Framatome ANP performed feedwater heater tube plug removal, tube expansions at the end plate, and sleeving. All work on-site was performed within the outage scheduling constraints.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Since 1990, an increasing number of the 304 SST feedwater heater tubes in the number 1 and 2 feedwater heaters (six heaters total) at the Wolf Creek Nuclear Power Plant have experienced failure due to fretting wear within the drain cooler region. Tube damage was due to thin end plate design resulting in tube wear at the end plate and support plate locations. Despite performing extensive eddy current inspections and preventative plugging on the heaters, the damage mechanism is powerful enough that tube leaks were continuing to occur while at power, resulting in the forced shutdown of a string of heaters for plugging. As an option to feedwater heater replacement, a method of reducing the tube-to-end plate gap, by expanding the tube into very close contact with the end plate, and sleeving tubes with wear indications was evaluated. Based on an evaluation of outage schedule time and cost, it was decided that the option of repairing the feedwater heaters, rather than replacing them, would be pursued. During Wolf Creek’s September 2000 refueling outage, Framatome ANP performed feedwater heater tube plug removal, tube expansions at the end plate, and sleeving. All work on-site was performed within the outage scheduling constraints.

Key concepts: Boiler feedwater, Tube (container), Nuclear engineering, Feedwater heater, Spark plug, Environmental science, Engineering, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Wolf Creek Feedwater Heater Repair — Research Paper | ScholarLens