THE HEATHROW EXPRESS TRIAL TUNNEL.
Anthony Deane, R H Bassett
Abstract
Anthony Deane, R H Bassett
Abstract
Keywords MOTT MACDONALD KIER LILLEY KUNZ TUNNELS, TRIAL, NATM, NEW, AUSTRIAN, TUNNELLING, METHODS, EXPRESSES, RAILWAYS, HIGH SPEED, UNDERGROUND, PROJECTS, BORED, CONSTRUCTION, DESIGN, INSTRUMENTATION, INSTRUMENTS, INSTALLATION, METHODS, MONITORING, GROUND, MOVEMENT, SETTLEMENT, PREDICTION, GEOLOGY, CLAYS, LONDON CLAY, CONTRACTS, JOINT VENTURES, EXCAVATION, MEASUREMENT, SUBSURFACE, DISPLACEMENT HEATHROW, LONDON UK... Show All
OpenAlex reports 82 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Keywords MOTT MACDONALD KIER LILLEY KUNZ TUNNELS, TRIAL, NATM, NEW, AUSTRIAN, TUNNELLING, METHODS, EXPRESSES, RAILWAYS, HIGH SPEED, UNDERGROUND, PROJECTS, BORED, CONSTRUCTION, DESIGN, INSTRUMENTATION, INSTRUMENTS, INSTALLATION, METHODS, MONITORING, GROUND, MOVEMENT, SETTLEMENT, PREDICTION, GEOLOGY, CLAYS, LONDON CLAY, CONTRACTS, JOINT VENTURES, EXCAVATION, MEASUREMENT, SUBSURFACE, DISPLACEMENT HEATHROW, LONDON UK... Show All
Key concepts: New Austrian Tunnelling method, Excavation, Settlement (finance), Instrumentation (computer programming), Civil engineering, Displacement (psychology), Joint (building), Engineering