2020Journal of Rock Mechanics and Geotechnical EngineeringOpen access

Evaluation of new Austrian tunnelling method applied to Bolu tunnel's weak rocks

Ebu Bekir Aygar

Open full text 101 citations

Abstract

Since the development of the new Austrian tunnelling method (NATM) in the 1960s, this technique has been applied successfully in many tunnels. However, opinions of NATM principles emerged till 2000, i.e. NATM is not a tunnelling method, but an approach covering all general principles of tunnelling. To investigate the general principles of the NATM, this study focused on tunnelling practises in the Bolu tunnel, and evaluated the conditions under which the NATM practises could be effective. The Bolu tunnel project was designed following the NATM principles. It is evident that practises adopted in this tunnel are important with respect to the NATM. In addition, it shows that the solutions to the problems encountered in this tunnel are consistent with the NATM principles. Finally, the study determines the ground types of the NATM principles and proposes associated updates.

Open-access reader

About this research paper

What this paper is about

Since the development of the new Austrian tunnelling method (NATM) in the 1960s, this technique has been applied successfully in many tunnels. However, opinions of NATM principles emerged till 2000, i.e. NATM is not a tunnelling method, but an approach covering all general principles of tunnelling. To investigate the general principles of the NATM, this study focused on tunnelling practises in the Bolu tunnel, and evaluated the conditions under which the NATM practises could be effective. The Bolu tunnel project was designed following the NATM principles. It is evident that practises adopted in this tunnel are important with respect to the NATM. In addition, it shows that the solutions to the problems encountered in this tunnel are consistent with the NATM principles. Finally, the study determines the ground types of the NATM principles and proposes associated updates.

Why it matters

OpenAlex reports 101 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Since the development of the new Austrian tunnelling method (NATM) in the 1960s, this technique has been applied successfully in many tunnels. However, opinions of NATM principles emerged till 2000, i.e. NATM is not a tunnelling method, but an approach covering all general principles of tunnelling. To investigate the general principles of the NATM, this study focused on tunnelling practises in the Bolu tunnel, and evaluated the conditions under which the NATM practises could be effective. The Bolu tunnel project was designed following the NATM principles. It is evident that practises adopted in this tunnel are important with respect to the NATM. In addition, it shows that the solutions to the problems encountered in this tunnel are consistent with the NATM principles. Finally, the study determines the ground types of the NATM principles and proposes associated updates.

Key concepts: New Austrian Tunnelling method, Quantum tunnelling, Tunnel construction, Railway tunnel, Engineering, Civil engineering, Geotechnical engineering, Physics

Related papers

Back to paper searchBrowse research topicsOriginal source
Evaluation of new Austrian tunnelling method applied to Bolu tunnel's weak rocks — Research Paper | ScholarLens