2007•Unpublished venueRequires access

TOC/DBR based production planning and control in a manufacturing system with multiple system bottlenecks

Zailin Guan, Yizhong Peng, Xiaoyue Yang, Xinyu Shao

Open publisher page 4 citations

Abstract

Bottleneck limits the throughput of a system, and multiple bottlenecks make the system harder to plan and control. In this paper, we propose a TOC/DBR based method for production planning and control when multiple bottlenecks exist. Especially, an algorithm for bottleneck scheduling with setup time is presented, and some simulation study has been carried out in an electronics manufacturing enterprise to validate its effect.

About this research paper

What this paper is about

Bottleneck limits the throughput of a system, and multiple bottlenecks make the system harder to plan and control. In this paper, we propose a TOC/DBR based method for production planning and control when multiple bottlenecks exist. Especially, an algorithm for bottleneck scheduling with setup time is presented, and some simulation study has been carried out in an electronics manufacturing enterprise to validate its effect.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Bottleneck limits the throughput of a system, and multiple bottlenecks make the system harder to plan and control. In this paper, we propose a TOC/DBR based method for production planning and control when multiple bottlenecks exist. Especially, an algorithm for bottleneck scheduling with setup time is presented, and some simulation study has been carried out in an electronics manufacturing enterprise to validate its effect.

Key concepts: Bottleneck, Production planning, Scheduling (production processes), Computer science, Production control, Manufacturing execution system, Plan (archaeology), Control (management)

Related papers

Back to paper searchBrowse research topicsOriginal source
TOC/DBR based production planning and control in a manufacturing system with multiple system bottlenecks — Research Paper | ScholarLens